IAC logo
IAC Assessment: UU0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Animal Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 18
Plant Area (Sq.Ft.) 40,000
Annual Production 205,000 Tons
Production Hrs. Annual 4,590
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,420 2,365,200 kWh $0.03
Electricity Demand $146,194 10,524 kW-months/year $13.89
Electricity Fees $9,108 - $ -
Natural Gas $185,638 40,722 MMBtu $4.56
TOTAL ENERGY COSTS $422,361
RECOMMENDED SAVINGS* $44,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,354
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,454
Cost:
$25,000
- - - - $12,454 - - - -
-
kWh
-
-
kW-months/year
$12,454
-
$
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,938
Cost:
$33,750
- - - - - - $8,938 1,960 -
-
kWh
-
-
kW-months/year
-
-
$
$8,938
1,960
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,182
Cost:
$4,000
- - - - - - $7,182 1,575 -
-
kWh
-
-
kW-months/year
-
-
$
$7,182
1,575
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,073
Cost:
$13,873
$3,389 98,478 $3,684 265 - - - - $3,389
98,478
kWh
$3,684
265
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,445
Cost:
$6,445
$6,445 187,246 - - - - - - $6,445
187,246
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$776
Cost:
$126
$776 22,553 - - - - - - $776
22,553
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$503
Cost:
$503
$245 7,061 $258 18 - - - - $245
7,061
kWh
$258
18
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$425
Cost:
$815
$425 12,352 - - - - - - $425
12,352
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$323
Cost:
$227
$126 3,666 $196 14 - - - - $126
3,666
kWh
$196
14
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$44,119
Cost:
$84,739
$11,407 331,356 $4,138 298 $12,454 - $16,120 3,535 $11,407
331,356
kWh
$4,138
298
kW-months/year
$12,454
-
$
$16,120
3,535
MMBtu
TOTAL IMPLEMENTED Savings:
$15,354
Cost:
$18,226
$4,291 124,697 $3,880 279 - - $7,182 1,575 $4,291
124,697
kWh
$3,880
279
kW-months/year
-
-
$
$7,182
1,575
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas