IAC logo
IAC Assessment: UU0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Fiberglass Insulation
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 300,000
Annual Production 74,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,286,699 39,148,800 kWh $0.03
Electricity Demand $824,761 60,040 kW-months/year $13.74
Natural Gas $375,950 91,671 MMBtu $4.10
TOTAL ENERGY COSTS $2,487,410
RECOMMENDED SAVINGS* $79,392 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,862
Cost:
$88,688
$17,399 528,844 $9,463 689 $17,399
528,844
kWh
$9,463
689
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,604
Cost:
$16,880
$14,383 437,176 $8,221 599 $14,383
437,176
kWh
$8,221
599
kW-months/year
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$20,172
Cost:
$4,900
$12,922 391,580 $7,249 528 $12,922
391,580
kWh
$7,249
528
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,017
Cost:
$14,979
$5,101 155,052 $2,916 212 $5,101
155,052
kWh
$2,916
212
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,737
Cost:
$860
$1,105 33,590 $632 46 $1,105
33,590
kWh
$632
46
kW-months/year
TOTAL RECOMMENDED Savings:
$79,392
Cost:
$126,307
$50,910 1,546,242 $28,481 2,074 $50,910
1,546,242
kWh
$28,481
2,074
kW-months/year
TOTAL IMPLEMENTED Savings:
$59,220
Cost:
$121,407
$37,988 1,154,662 $21,232 1,546 $37,988
1,154,662
kWh
$21,232
1,546
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand