IAC logo
IAC Assessment: UU0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product custom bulk explosive trucks
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 105,000
Annual Production 50 Units
Production Hrs. Annual 2,625
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,675 623,400 kWh $0.04
Electricity Demand $42,118 2,537 kW-months/year $16.60
Electricity Fees $6,481 - $ -
Natural Gas $44,109 4,875 MMBtu $9.05
TOTAL ENERGY COSTS $115,383
RECOMMENDED SAVINGS* $18,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,919
Cost:
$19,705
$3,666 100,701 $6,253 377 - - $3,666
100,701
kWh
$6,253
377
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,932
Cost:
$15,000
$(-491) 13,494 $(-797) 48 $5,220 577 $(-491)
13,494
kWh
$(-797)
48
kW-months/year
$5,220
577
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,796
Cost:
$4,794
$211 5,793 - - $2,585 286 $211
5,793
kWh
-
-
kW-months/year
$2,585
286
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$822
Cost:
$1,645
$247 6,786 $575 35 - - $247
6,786
kWh
$575
35
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$544
Cost:
$200
$544 14,951 - - - - $544
14,951
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$398
Cost:
$883
$398 10,927 - - - - $398
10,927
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,411
Cost:
$42,227
$4,574 152,651 $6,032 459 $7,806 863 $4,574
152,651
kWh
$6,032
459
kW-months/year
$7,806
863
MMBtu
TOTAL IMPLEMENTED Savings:
$11,683
Cost:
$22,433
$4,854 133,364 $6,828 411 - - $4,854
133,364
kWh
$6,828
411
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas