IAC Assessment: UU0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 237110 - Water and Sewer Line and Related Structures Construction
SIC 1623 - Water, Sewer, And Utility Lines
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 522,729
Annual Production 924,371 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,825 3,465,000 kWh $0.04
Electricity Demand $102,177 6,221 kW-months/year $16.42
Electricity Fees $4,118 - $ -
Natural Gas $49,650 8,003 MMBtu $6.20
Fuel Oil #1 $19,404 765 MMBtu $25.37
TOTAL ENERGY COSTS $301,174
RECOMMENDED SAVINGS* $107,134 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $90,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$83,964
Cost:
$377,320
$15,859 426,766 $9,828 599 - - - - - - $58,277 - $15,859
426,766
kWh
$9,828
599
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$58,277
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,049
Cost:
$6,500
- - - - $5,049 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,049
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,446
Cost:
$14,800
- - - - - - - - $5,446 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,446
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,107
Cost:
$1,876
$1,053 28,995 $54 3 - - - - - - - - $1,053
28,995
kWh
$54
3
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$788
Cost:
$3,863
$453 12,292 $335 20 - - - - - - - - $453
12,292
kWh
$335
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.8222 SIZE TRUCKS TO JOB Savings:
$10,780
Cost:
$56,000
- - - - - - $10,780 425 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,780
425
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$107,134
Cost:
$460,359
$17,365 468,053 $10,217 623 $5,049 - $10,780 425 $5,446 - $58,277 - $17,365
468,053
kWh
$10,217
623
kW-months/year
$5,049
-
$
$10,780
425
MMBtu
$5,446
-
$
$58,277
-
$
TOTAL IMPLEMENTED Savings:
$90,198
Cost:
$395,983
$16,312 439,058 $10,163 619 - - - - $5,446 - $58,277 - $16,312
439,058
kWh
$10,163
619
kW-months/year
-
-
$
-
-
MMBtu
$5,446
-
$
$58,277
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Administrative Changes One-time Revenue or Avoided Cost