IAC logo
IAC Assessment: UU0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product stringers and frames for commercial airplanes
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 1,500
Plant Area (Sq.Ft.) 615,000
Annual Production 36 Units
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $935,021 26,022,921 kWh $0.04
Electricity Demand $975,042 56,689 kW-months/year $17.20
Electricity Fees $175,886 - $ -
Natural Gas $348,786 70,870 MMBtu $4.92
TOTAL ENERGY COSTS $2,434,735
RECOMMENDED SAVINGS* $98,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,072
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52,219
Cost:
$52,219
$31,579 877,183 $20,640 1,200 - - - - $31,579
877,183
kWh
$20,640
1,200
kW-months/year
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,872
Cost:
$40,613
$15,456 429,334 $13,416 780 - - - - $15,456
429,334
kWh
$13,416
780
kW-months/year
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,994
Cost:
$15,475
$2,758 76,485 $2,236 130 - - - - $2,758
76,485
kWh
$2,236
130
kW-months/year
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,945
Cost:
$5,606
- - - - $3,945 - - - -
-
kWh
-
-
kW-months/year
$3,945
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,978
Cost:
$3,520
$2,978 82,879 - - - - - - $2,978
82,879
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,269
Cost:
$1,000
$1,849 51,364 $2,420 141 - - - - $1,849
51,364
kWh
$2,420
141
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,064
Cost:
$4,892
$643 17,888 $421 25 - - - - $643
17,888
kWh
$421
25
kW-months/year
-
-
$
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$464
Cost:
$100
- - - - - - $464 - -
-
kWh
-
-
kW-months/year
-
-
$
$464
-
$
TOTAL RECOMMENDED Savings:
$98,806
Cost:
$123,425
$55,263 1,535,132 $39,134 2,275 $3,945 - $464 - $55,263
1,535,132
kWh
$39,134
2,275
kW-months/year
$3,945
-
$
$464
-
$
TOTAL IMPLEMENTED Savings:
$94,072
Cost:
$122,325
$53,414 1,483,769 $36,713 2,135 $3,945 - - - $53,414
1,483,769
kWh
$36,713
2,135
kW-months/year
$3,945
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost