IAC Assessment: UU0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product Water Distribution
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 11,500
Annual Production 710,360 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,360 1,977,372 kWh $0.06
Electricity Demand $72,382 9,282 kW-months/year $7.80
Electricity Fees $16,274 - $ -
Natural Gas $1,288 120 MMBtu $10.77
TOTAL ENERGY COSTS $214,304
RECOMMENDED SAVINGS* $50,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,391
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ $ $ MMBtu $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$13,098
Cost:
$10,000
- - - - - - $13,098 - -
-
kWh
-
-
$
-
-
MMBtu
$13,098
-
$
02: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$12,033
Cost:
$300
- - - - - - $12,033 - -
-
kWh
-
-
$
-
-
MMBtu
$12,033
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,900
Cost:
$3,000
- - - - - - $10,900 - -
-
kWh
-
-
$
-
-
MMBtu
$10,900
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,230
Cost:
$4,000
$1,330 18,083 - - - - $10,900 - $1,330
18,083
kWh
-
-
$
-
-
MMBtu
$10,900
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,591
Cost:
$6,000
- - $1,591 - - - - - -
-
kWh
$1,591
-
$
-
-
MMBtu
-
-
$
06: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$130
Cost:
$25
- - - - - - $130 - -
-
kWh
-
-
$
-
-
MMBtu
$130
-
$
07: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$380
Cost:
$200
- - - - $380 47 - - -
-
kWh
-
-
$
$380
47
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,362
Cost:
$23,525
$1,330 18,083 $1,591 - $380 47 $47,061 - $1,330
18,083
kWh
$1,591
-
$
$380
47
MMBtu
$47,061
-
$
TOTAL IMPLEMENTED Savings:
$48,391
Cost:
$17,325
$1,330 18,083 - - - - $47,061 - $1,330
18,083
kWh
-
-
$
-
-
MMBtu
$47,061
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas One-time Revenue or Avoided Cost