IAC logo
IAC Assessment: UU0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product Fluid seals
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 90,000,000 Pieces
Production Hrs. Annual 8,757
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,928 8,800,200 kWh $0.03
Electricity Demand $254,511 17,256 kW-months/year $14.75
Electricity Fees $154,328 - $ -
Natural Gas $26,722 2,915 MMBtu $9.17
TOTAL ENERGY COSTS $733,489
RECOMMENDED SAVINGS* $92,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$45,240
Cost:
$17,600
$45,240 1,330,600 - - $45,240
1,330,600
kWh
-
-
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,275
Cost:
$12,600
- - $13,275 900 -
-
kWh
$13,275
900
kW-months/year
03: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$10,674
Cost:
$25,650
$6,426 188,997 $4,248 288 $6,426
188,997
kWh
$4,248
288
kW-months/year
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,347
Cost:
$5,215
$2,489 73,200 $4,858 329 $2,489
73,200
kWh
$4,858
329
kW-months/year
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,414
Cost:
$1,000
$4,414 129,827 - - $4,414
129,827
kWh
-
-
kW-months/year
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$4,228
Cost:
$2,448
$2,651 77,991 $1,577 107 $2,651
77,991
kWh
$1,577
107
kW-months/year
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,552
Cost:
$4,497
$1,338 39,354 $1,214 82 $1,338
39,354
kWh
$1,214
82
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,260
Cost:
$3,781
$2,260 66,470 - - $2,260
66,470
kWh
-
-
kW-months/year
09: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,637
Cost:
$1,536
$1,637 48,155 - - $1,637
48,155
kWh
-
-
kW-months/year
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$825
Cost:
$900
$825 24,274 - - $825
24,274
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$92,452
Cost:
$75,227
$67,280 1,978,868 $25,172 1,707 $67,280
1,978,868
kWh
$25,172
1,707
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand