IAC Assessment: UU0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product plastic stretch and shrink wrap
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 105
Plant Area (Sq.Ft.) 120,000
Annual Production 21,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $475,256 16,900,800 kWh $0.03
Electricity Demand $428,064 27,907 kW-months/year $15.34
Electricity Fees $115,570 - $ -
TOTAL ENERGY COSTS $1,018,890
RECOMMENDED SAVINGS* $71,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,700
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,031
Cost:
$23,302
- - - - $14,031 - -
-
kWh
-
-
kW-months/year
$14,031
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,069
Cost:
$17,638
$2,613 92,985 $1,456 95 - - $2,613
92,985
kWh
$1,456
95
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,776
Cost:
$6,969
$1,027 36,551 $1,749 114 - - $1,027
36,551
kWh
$1,749
114
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,274
Cost:
$495
$851 30,269 $423 28 - - $851
30,269
kWh
$423
28
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$701
Cost:
$1,150
$356 12,679 $345 23 - - $356
12,679
kWh
$345
23
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$550
Cost:
$1,558
$275 9,802 $275 18 - - $275
9,802
kWh
$275
18
kW-months/year
-
-
$
07: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$24,046
Cost:
$226,100
$2,550 - $21,496 755 - - $2,550
-
kWh
$21,496
755
kW-months/year
-
-
$
08: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$23,820
Cost:
$214,625
$15,997 569,169 $7,823 510 - - $15,997
569,169
kWh
$7,823
510
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$71,267
Cost:
$491,837
$23,669 751,455 $33,567 1,542 $14,031 - $23,669
751,455
kWh
$33,567
1,542
kW-months/year
$14,031
-
$
TOTAL IMPLEMENTED Savings:
$22,700
Cost:
$49,962
$4,766 169,607 $3,903 254 $14,031 - $4,766
169,607
kWh
$3,903
254
kW-months/year
$14,031
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees