IAC logo
IAC Assessment: UU0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Ice cream
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $1,000,000-$5,000,000
# of Employees 8
Plant Area (Sq.Ft.) 43,000
Annual Production 450,000 Pounds
Production Hrs. Annual 2,000
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,458 1,587,936 kWh $0.09
Other Energy $81,198 5,497 MMBtu $14.77
TOTAL ENERGY COSTS $229,656
RECOMMENDED SAVINGS* $200,364 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $200,364
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Water Usage Increase in Production Electricity Usage Natural Gas Other Energy Water Usage Increase in Production
$ kWh $ MMBtu $ MMBtu $ Tgal $ %
01: 4.452 ELIMINATE SHIFT Savings:
$171,281
Cost:
$5,500
- - - - - - - - $171,281 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$171,281
-
%
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$16,735
Cost:
$51,600
- - - - $16,735 7,534 - - - - -
-
kWh
-
-
MMBtu
$16,735
7,534
MMBtu
-
-
Tgal
-
-
%
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$8,766
Cost:
$26,767
$1,056 10,436 - - - - $7,710 7,229 - - $1,056
10,436
kWh
-
-
MMBtu
-
-
MMBtu
$7,710
7,229
Tgal
-
-
%
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,305
Cost:
$11,743
- - $2,577 229 - - $728 196 - - -
-
kWh
$2,577
229
MMBtu
-
-
MMBtu
$728
196
Tgal
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$277
Cost:
$142
$277 2,733 - - - - - - - - $277
2,733
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
%
TOTAL RECOMMENDED Savings:
$200,364
Cost:
$95,752
$1,333 13,169 $2,577 229 $16,735 7,534 $8,438 7,425 $171,281 - $1,333
13,169
kWh
$2,577
229
MMBtu
$16,735
7,534
MMBtu
$8,438
7,425
Tgal
$171,281
-
%
TOTAL IMPLEMENTED Savings:
$200,364
Cost:
$95,752
$1,333 13,169 $2,577 229 $16,735 7,534 $8,438 7,425 $171,281 - $1,333
13,169
kWh
$2,577
229
MMBtu
$16,735
7,534
MMBtu
$8,438
7,425
Tgal
$171,281
-
%
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal $ %
Electricity Usage Natural Gas Other Energy Water Usage Increase in Production Electricity Usage Natural Gas Other Energy Water Usage Increase in Production