Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2024 |
Principal Product | Medical equipment |
NAICS | 339999 - All Other Miscellaneous Manufacturing |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 221 |
Plant Area (Sq.Ft.) | 29,000 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 5,840 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $54,556 | 720,640 | kWh | $0.08 |
Natural Gas | $31,307 | 2,629 | MMBtu | $11.91 |
TOTAL ENERGY COSTS | $85,863 | |||
RECOMMENDED SAVINGS* | $35,469 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,429 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $10,990 Cost: $184,280 |
$10,990 | 144,580 | - | - | - | - |
$10,990 144,580 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7314 REDUCE VENTILATION AIR |
Savings: $7,109 Cost: $28,950 |
$2,556 | 33,636 | $4,552 | 382 | - | - |
$2,556 33,636 kWh |
$4,552 382 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,340 Cost: $23,500 |
$5,340 | 70,320 | - | - | - | - |
$5,340 70,320 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $6,350 Cost: $8,970 |
$6,350 | 83,554 | - | - | - | - |
$6,350 83,554 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,430 Cost: $3,000 |
$3,430 | 45,150 | - | - | - | - |
$3,430 45,150 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,040 Cost: $375 |
$2,040 | 26,880 | - | - | - | - |
$2,040 26,880 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $210 Cost: $150 |
- | - | - | - | $210 | - |
- - kWh |
- - MMBtu |
$210 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,469 Cost: $249,225 |
$30,706 | 404,120 | $4,552 | 382 | $210 | - | $30,706 404,120 kWh |
$4,552 382 MMBtu |
$210 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,429 Cost: $248,850 |
$28,666 | 377,240 | $4,552 | 382 | $210 | - | $28,666 377,240 kWh |
$4,552 382 MMBtu |
$210 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost |