IAC logo
IAC Assessment: UU0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Medical equipment
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $1,000,000-$5,000,000
# of Employees 221
Plant Area (Sq.Ft.) 29,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 5,840
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,556 720,640 kWh $0.08
Natural Gas $31,307 2,629 MMBtu $11.91
TOTAL ENERGY COSTS $85,863
RECOMMENDED SAVINGS* $35,469 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,429
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$10,990
Cost:
$184,280
$10,990 144,580 - - - - $10,990
144,580
kWh
-
-
MMBtu
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$7,109
Cost:
$28,950
$2,556 33,636 $4,552 382 - - $2,556
33,636
kWh
$4,552
382
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,340
Cost:
$23,500
$5,340 70,320 - - - - $5,340
70,320
kWh
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,350
Cost:
$8,970
$6,350 83,554 - - - - $6,350
83,554
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,430
Cost:
$3,000
$3,430 45,150 - - - - $3,430
45,150
kWh
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,040
Cost:
$375
$2,040 26,880 - - - - $2,040
26,880
kWh
-
-
MMBtu
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$210
Cost:
$150
- - - - $210 - -
-
kWh
-
-
MMBtu
$210
-
$
TOTAL RECOMMENDED Savings:
$35,469
Cost:
$249,225
$30,706 404,120 $4,552 382 $210 - $30,706
404,120
kWh
$4,552
382
MMBtu
$210
-
$
TOTAL IMPLEMENTED Savings:
$33,429
Cost:
$248,850
$28,666 377,240 $4,552 382 $210 - $28,666
377,240
kWh
$4,552
382
MMBtu
$210
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost