IAC logo
IAC Assessment: UU0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Agricultural Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 35,147
Annual Production 278 Units
Production Hrs. Annual 2,739
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,822 234,126 kWh $0.05
Electricity Demand $5,404 1,081 kW-months/year $5.00
Electricity Fees $40 - $ -
Natural Gas $10,054 1,292 MMBtu $7.78
LPG $7,426 114 MMBtu $64.91
Fuel Oil #2 $16,025 433 MMBtu $37.02
Fuel Oil #4 $55,580 2,387 MMBtu $23.28
TOTAL ENERGY COSTS $105,351
RECOMMENDED SAVINGS* $45,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #4 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Fuel Oil #4 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$980
Cost:
$2,600
$836 17,940 $144 29 - - - - - - - - $836
17,940
kWh
$144
29
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,740
Cost:
$1,270
$1,715 37,080 $25 5 - - - - - - - - $1,715
37,080
kWh
$25
5
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 3.1194 USE AUTOMATIC FLOW CONTROL Savings:
$820
Cost:
$4,250
$694 15,090 $126 25 - - - - - - - - $694
15,090
kWh
$126
25
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$33,420
Cost:
$319,250
$(-620) (-13,440) - - $2,480 38 $26,870 1,154 $4,690 - - - $(-620)
(-13,440)
kWh
-
-
kW-months/year
$2,480
38
MMBtu
$26,870
1,154
MMBtu
$4,690
-
$
-
-
$
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$6,380
Cost:
$133,800
$(-1,050) (-22,770) - - $7,430 114 - - - - - - $(-1,050)
(-22,770)
kWh
-
-
kW-months/year
$7,430
114
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$940
Cost:
$3,000
- - - - - - - - - - $940 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$940
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,570
Cost:
$9,360
$1,570 34,320 - - - - - - - - - - $1,570
34,320
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,850
Cost:
$473,530
$3,145 68,220 $295 59 $9,910 153 $26,870 1,154 $4,690 - $940 - $3,145
68,220
kWh
$295
59
kW-months/year
$9,910
153
MMBtu
$26,870
1,154
MMBtu
$4,690
-
$
$940
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Fuel Oil #4 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Fuel Oil #4 Personnel Changes Ancillary Material Cost