IAC Assessment: UU0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Salt, Sulfate of Potash, and Magnesium Chloride
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2812 - Alkalies And Chlorine
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 175,000
Annual Production 325,000 Tons
Production Hrs. Annual 8,030
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,268,810 76,908,788 kWh $0.03
Electricity Demand $2,044,543 131,739 kW-months/year $15.52
Electricity Fees $739,077 - $ -
Natural Gas $7,083,780 1,636,512 MMBtu $4.33
TOTAL ENERGY COSTS $12,136,210
RECOMMENDED SAVINGS* $2,196,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$158,000
Cost:
$725,000
- - - - $158,000 36,400 - - -
-
kWh
-
-
kW-months/year
$158,000
36,400
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$25,800
Cost:
$6,200
- - - - $25,800 5,970 - - -
-
kWh
-
-
kW-months/year
$25,800
5,970
MMBtu
-
-
$
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$12,600
Cost:
$54,500
- - - - $12,600 2,900 - - -
-
kWh
-
-
kW-months/year
$12,600
2,900
MMBtu
-
-
$
04: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$1,690,000
Cost:
$23,500,000
$1,600,000 53,900,000 $1,250,000 80,500 $(-1,080,000) 251,000 $(-80,000) - $1,600,000
53,900,000
kWh
$1,250,000
80,500
kW-months/year
$(-1,080,000)
251,000
MMBtu
$(-80,000)
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,890
Cost:
$11,500
$4,420 150,000 $3,470 224 - - - - $4,420
150,000
kWh
$3,470
224
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,570
Cost:
$5,140
$1,550 52,700 $1,020 66 - - - - $1,550
52,700
kWh
$1,020
66
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$120,000
Cost:
$198,000
- - $120,000 7,720 - - - - -
-
kWh
$120,000
7,720
kW-months/year
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$180,000
Cost:
$20,000
- - $180,000 1,800 - - - - -
-
kWh
$180,000
1,800
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,196,860
Cost:
$24,520,340
$1,605,970 54,102,700 $1,554,490 90,310 $(-883,600) 296,270 $(-80,000) - $1,605,970
54,102,700
kWh
$1,554,490
90,310
kW-months/year
$(-883,600)
296,270
MMBtu
$(-80,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes