Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2024 |
Principal Product | Frozen food |
NAICS | 311412 - Frozen Specialty Food Manufacturing |
SIC | 2038 - Frozen Specialties, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 1,300 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 100,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,894,176 | 69,717,609 | kWh | $0.07 |
Electricity Demand | $1,374,835 | 122,213 | kW-months/year | $11.25 |
Electricity Fees | $361,669 | - | $ | - |
Natural Gas | $1,765,674 | 409,352 | MMBtu | $4.31 |
TOTAL ENERGY COSTS | $8,532,974 | |||
RECOMMENDED SAVINGS* | $4,418,831 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $3,866,540 Cost: $17,885,484 |
$6,049,900 | 86,180,880 | $1,328,010 | 118,056 | $1,332,772 | 309,228 | - | - | $(-4,844,142) | - |
$6,049,900 86,180,880 kWh |
$1,328,010 118,056 kW-months/year |
$1,332,772 309,228 MMBtu |
- - Tgal |
$(-4,844,142) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $221,450 Cost: $2,473,450 |
$215,344 | 2,974,850 | - | - | - | - | $6,106 | 3,400 | - | - |
$215,344 2,974,850 kWh |
- - kW-months/year |
- - MMBtu |
$6,106 3,400 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $205,038 Cost: $1,865,253 |
$102,492 | 1,460,000 | $102,546 | 9,116 | - | - | - | - | - | - |
$102,492 1,460,000 kWh |
$102,546 9,116 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $68,165 Cost: $110,030 |
$1,166 | 16,653 | $66,999 | 5,956 | - | - | - | - | - | - |
$1,166 16,653 kWh |
$66,999 5,956 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS |
Savings: $53,643 Cost: $33,000 |
$(-1,027) | 14,670 | $54,670 | 4,860 | - | - | - | - | - | - |
$(-1,027) 14,670 kWh |
$54,670 4,860 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $3,995 Cost: $9,200 |
$3,922 | 56,030 | $73 | 7 | - | - | - | - | - | - |
$3,922 56,030 kWh |
$73 7 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $4,418,831 Cost: $22,376,417 |
$6,371,796 | 90,703,083 | $1,552,298 | 137,995 | $1,332,772 | 309,228 | $6,106 | 3,400 | $(-4,844,142) | - | $6,371,796 90,703,083 kWh |
$1,552,298 137,995 kW-months/year |
$1,332,772 309,228 MMBtu |
$6,106 3,400 Tgal |
$(-4,844,142) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost |