IAC Assessment: UU0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Frozen food
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $100,000,000-$500,000,000
# of Employees 1,300
Plant Area (Sq.Ft.) 500,000
Annual Production 100,000 Tons
Production Hrs. Annual 6,240
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,894,176 69,717,609 kWh $0.07
Electricity Demand $1,374,835 122,213 kW-months/year $11.25
Electricity Fees $361,669 - $ -
Natural Gas $1,765,674 409,352 MMBtu $4.31
TOTAL ENERGY COSTS $8,532,974
RECOMMENDED SAVINGS* $4,418,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$3,866,540
Cost:
$17,885,484
$6,049,900 86,180,880 $1,328,010 118,056 $1,332,772 309,228 - - $(-4,844,142) - $6,049,900
86,180,880
kWh
$1,328,010
118,056
kW-months/year
$1,332,772
309,228
MMBtu
-
-
Tgal
$(-4,844,142)
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$221,450
Cost:
$2,473,450
$215,344 2,974,850 - - - - $6,106 3,400 - - $215,344
2,974,850
kWh
-
-
kW-months/year
-
-
MMBtu
$6,106
3,400
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$205,038
Cost:
$1,865,253
$102,492 1,460,000 $102,546 9,116 - - - - - - $102,492
1,460,000
kWh
$102,546
9,116
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$68,165
Cost:
$110,030
$1,166 16,653 $66,999 5,956 - - - - - - $1,166
16,653
kWh
$66,999
5,956
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$53,643
Cost:
$33,000
$(-1,027) 14,670 $54,670 4,860 - - - - - - $(-1,027)
14,670
kWh
$54,670
4,860
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$3,995
Cost:
$9,200
$3,922 56,030 $73 7 - - - - - - $3,922
56,030
kWh
$73
7
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$4,418,831
Cost:
$22,376,417
$6,371,796 90,703,083 $1,552,298 137,995 $1,332,772 309,228 $6,106 3,400 $(-4,844,142) - $6,371,796
90,703,083
kWh
$1,552,298
137,995
kW-months/year
$1,332,772
309,228
MMBtu
$6,106
3,400
Tgal
$(-4,844,142)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost