Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2025 |
Principal Product | mashed potatoes, dehydrated potatoes, hash browns, and other flavored potato products |
NAICS | 311423 - Dried and Dehydrated Food Manufacturing |
SIC | 2034 - Dehydrated Fruits, Vegetables, Soups |
Sales | $100,000,000-$500,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 75,000,000 Pounds |
Production Hrs. Annual | 7,680 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $990,583 | 17,755,813 | kWh | $0.06 |
Electricity Demand | $330,810 | 25,738 | kW-months/year | $12.85 |
Electricity Fees | $41,473 | - | $ | - |
Natural Gas | $4,144,422 | 750,434 | MMBtu | $5.52 |
LPG | $83,132 | 4,169 | MMBtu | $19.94 |
TOTAL ENERGY COSTS | $5,590,420 | |||
RECOMMENDED SAVINGS* | $1,503,560 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | LPG | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.443 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM |
Savings: $79,422 Cost: $143,652 |
- | - | - | - | $79,422 | 14,381 | - | - | - | - |
- - kWh |
- - kW-months/year |
$79,422 14,381 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $215,672 Cost: $730,950 |
- | - | - | - | $215,672 | 39,052 | - | - | - | - |
- - kWh |
- - kW-months/year |
$215,672 39,052 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $729,671 Cost: $3,645,455 |
$1,295,464 | 16,868,021 | - | - | $(-395,905) | (-71,683) | - | - | $(-169,888) | - |
$1,295,464 16,868,021 kWh |
- - kW-months/year |
$(-395,905) (-71,683) MMBtu |
- - MMBtu |
$(-169,888) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1224 REPLACE BOILER |
Savings: $379,077 Cost: $4,080,441 |
- | - | - | - | $379,077 | 68,636 | - | - | - | - |
- - kWh |
- - kW-months/year |
$379,077 68,636 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,332 Cost: $4,000 |
$2,823 | 50,602 | $509 | 40 | - | - | - | - | - | - |
$2,823 50,602 kWh |
$509 40 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,905 Cost: $7,317 |
$1,905 | 34,152 | - | - | - | - | - | - | - | - |
$1,905 34,152 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,405 Cost: $8,915 |
$3,032 | 54,346 | $1,373 | 107 | - | - | - | - | - | - |
$3,032 54,346 kWh |
$1,373 107 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $538 Cost: $1,531 |
$405 | 7,253 | $133 | 10 | - | - | - | - | - | - |
$405 7,253 kWh |
$133 10 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $44,517 Cost: $717,537 |
$44,159 | 791,540 | $358 | 28 | - | - | - | - | - | - |
$44,159 791,540 kWh |
$358 28 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $515 Cost: $916 |
$515 | 9,227 | - | - | - | - | - | - | - | - |
$515 9,227 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $44,506 Cost: $432,000 |
$(-32,734) | (-586,752) | $(-5,892) | (-458) | - | - | $83,132 | 4,169 | - | - |
$(-32,734) (-586,752) kWh |
$(-5,892) (-458) kW-months/year |
- - MMBtu |
$83,132 4,169 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,503,560 Cost: $9,772,714 |
$1,315,569 | 17,228,389 | $(-3,519) | (-274) | $278,266 | 50,386 | $83,132 | 4,169 | $(-169,888) | - | $1,315,569 17,228,389 kWh |
$(-3,519) (-274) kW-months/year |
$278,266 50,386 MMBtu |
$83,132 4,169 MMBtu |
$(-169,888) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | LPG | Administrative Changes |