IAC Assessment: UU0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product mashed potatoes, dehydrated potatoes, hash browns, and other flavored potato products
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 350,000
Annual Production 75,000,000 Pounds
Production Hrs. Annual 7,680
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $990,583 17,755,813 kWh $0.06
Electricity Demand $330,810 25,738 kW-months/year $12.85
Electricity Fees $41,473 - $ -
Natural Gas $4,144,422 750,434 MMBtu $5.52
LPG $83,132 4,169 MMBtu $19.94
TOTAL ENERGY COSTS $5,590,420
RECOMMENDED SAVINGS* $1,503,560 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 4.443 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM Savings:
$79,422
Cost:
$143,652
- - - - $79,422 14,381 - - - - -
-
kWh
-
-
kW-months/year
$79,422
14,381
MMBtu
-
-
MMBtu
-
-
$
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$215,672
Cost:
$730,950
- - - - $215,672 39,052 - - - - -
-
kWh
-
-
kW-months/year
$215,672
39,052
MMBtu
-
-
MMBtu
-
-
$
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$729,671
Cost:
$3,645,455
$1,295,464 16,868,021 - - $(-395,905) (-71,683) - - $(-169,888) - $1,295,464
16,868,021
kWh
-
-
kW-months/year
$(-395,905)
(-71,683)
MMBtu
-
-
MMBtu
$(-169,888)
-
$
04: 2.1224 REPLACE BOILER Savings:
$379,077
Cost:
$4,080,441
- - - - $379,077 68,636 - - - - -
-
kWh
-
-
kW-months/year
$379,077
68,636
MMBtu
-
-
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,332
Cost:
$4,000
$2,823 50,602 $509 40 - - - - - - $2,823
50,602
kWh
$509
40
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,905
Cost:
$7,317
$1,905 34,152 - - - - - - - - $1,905
34,152
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,405
Cost:
$8,915
$3,032 54,346 $1,373 107 - - - - - - $3,032
54,346
kWh
$1,373
107
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$538
Cost:
$1,531
$405 7,253 $133 10 - - - - - - $405
7,253
kWh
$133
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$44,517
Cost:
$717,537
$44,159 791,540 $358 28 - - - - - - $44,159
791,540
kWh
$358
28
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$515
Cost:
$916
$515 9,227 - - - - - - - - $515
9,227
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$44,506
Cost:
$432,000
$(-32,734) (-586,752) $(-5,892) (-458) - - $83,132 4,169 - - $(-32,734)
(-586,752)
kWh
$(-5,892)
(-458)
kW-months/year
-
-
MMBtu
$83,132
4,169
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,503,560
Cost:
$9,772,714
$1,315,569 17,228,389 $(-3,519) (-274) $278,266 50,386 $83,132 4,169 $(-169,888) - $1,315,569
17,228,389
kWh
$(-3,519)
(-274)
kW-months/year
$278,266
50,386
MMBtu
$83,132
4,169
MMBtu
$(-169,888)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes