IAC logo
IAC Assessment: UU0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product Ice rink
NAICS 713940 - Fitness and Recreational Sports Centers
SIC 7999 - Amusement And Recreation, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 120,000
Annual Production 1 Units
Production Hrs. Annual 6,032
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,920 2,355,840 kWh $0.05
Electricity Demand $64,696 4,387 kW-months/year $14.75
Electricity Fees $10,750 - $ -
Natural Gas $71,970 7,470 MMBtu $9.63
TOTAL ENERGY COSTS $255,336
RECOMMENDED SAVINGS* $66,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$12,948
Cost:
$57,090
$(-60) (-1,350) $(-382) (-26) $13,390 1,390 - - $(-60)
(-1,350)
kWh
$(-382)
(-26)
kW-months/year
$13,390
1,390
MMBtu
-
-
$
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$4,322
Cost:
$21,080
$660 14,420 $292 20 $3,370 350 - - $660
14,420
kWh
$292
20
kW-months/year
$3,370
350
MMBtu
-
-
$
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$2,977
Cost:
$13,970
$463 10,020 $202 14 $2,311 240 - - $463
10,020
kWh
$202
14
kW-months/year
$2,311
240
MMBtu
-
-
$
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$29,270
Cost:
$414,260
$29,270 633,600 - - - - - - $29,270
633,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,874
Cost:
$41,100
$4,200 90,390 $2,194 149 - - $10,480 - $4,200
90,390
kWh
$2,194
149
kW-months/year
-
-
MMBtu
$10,480
-
$
TOTAL RECOMMENDED Savings:
$66,391
Cost:
$547,500
$34,533 747,080 $2,306 156 $19,071 1,980 $10,480 - $34,533
747,080
kWh
$2,306
156
kW-months/year
$19,071
1,980
MMBtu
$10,480
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes