IAC Assessment: UW0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2007
Principal Product Tempered glass panes and insulated glass panes
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 64,000
Annual Production 800,000 Pieces
Production Hrs. Annual 7,488
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,656 8,142,000 kWh $0.03
Electricity Demand $121,971 20,569 kW-months/year $5.93
Electricity Fees $10,893 - $ -
Other Gas $5,000 1,000 MMBtu $5.00
TOTAL ENERGY COSTS $468,294
RECOMMENDED SAVINGS* $47,913 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,851
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,263
Cost:
$85,000
$21,263 628,054 - - - - - - $21,263
628,054
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,893
Cost:
$16,323
- - $10,893 1,837 - - - - -
-
kWh
$10,893
1,837
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,000
Cost:
$9,385
- - - - $5,000 1,000 $3,000 - -
-
kWh
-
-
kW-months/year
$5,000
1,000
MMBtu
$3,000
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,998
Cost:
$2,692
$5,998 177,158 - - - - - - $5,998
177,158
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$700
Cost:
$252
$820 24,216 - - - - $(-120) - $820
24,216
kWh
-
-
kW-months/year
-
-
MMBtu
$(-120)
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$906
Cost:
$653
$633 18,705 $273 46 - - - - $633
18,705
kWh
$273
46
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$153
Cost:
$200
$153 4,524 - - - - - - $153
4,524
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,913
Cost:
$114,505
$28,867 852,657 $11,166 1,883 $5,000 1,000 $2,880 - $28,867
852,657
kWh
$11,166
1,883
kW-months/year
$5,000
1,000
MMBtu
$2,880
-
$
TOTAL IMPLEMENTED Savings:
$14,851
Cost:
$12,529
$6,971 205,898 - - $5,000 1,000 $2,880 - $6,971
205,898
kWh
-
-
kW-months/year
$5,000
1,000
MMBtu
$2,880
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes