IAC logo
IAC Assessment: UW0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2008
Principal Product Brass and Aluminum Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $1,000,000-$5,000,000
# of Employees 23
Plant Area (Sq.Ft.) 13,000
Annual Production 50,000 Pieces
Production Hrs. Annual 3,900
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,113 570,496 kWh $0.05
Electricity Demand $3,956 3,841 kW-months/year $1.03
Electricity Fees $919 - $ -
Natural Gas $44,470 3,807 MMBtu $11.68
TOTAL ENERGY COSTS $78,458
RECOMMENDED SAVINGS* $80,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 4.7120 UTILIZE JOB COSTING SOFTWARE Savings:
$55,734
Cost:
$72,000
- - - - $55,734 5,213 -
-
kWh
-
-
kW-months/year
$55,734
5,213
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,434
Cost:
$34,000
$11,692 250,380 $742 720 - - $11,692
250,380
kWh
$742
720
kW-months/year
-
-
MMBtu
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$9,391
Cost:
$39,900
- - - - $9,391 876 -
-
kWh
-
-
kW-months/year
$9,391
876
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,375
Cost:
$4,328
$2,375 50,856 - - - - $2,375
50,856
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,037
Cost:
$2,775
$1,037 21,966 - - - - $1,037
21,966
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,971
Cost:
$153,003
$15,104 323,202 $742 720 $65,125 6,089 $15,104
323,202
kWh
$742
720
kW-months/year
$65,125
6,089
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas