Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2009 |
Principal Product | Plastic Containers |
NAICS | 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 6,132 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $217,007 | 6,657,880 | kWh | $0.03 |
Electricity Fees | $552 | - | $ | - |
TOTAL ENERGY COSTS | $234,346 | |||
RECOMMENDED SAVINGS* | $34,661 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,661 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $13,416 Cost: $120,000 |
$8,018 | 272,615 | $3,898 | 676 | $1,500 | - |
$8,018 272,615 kWh |
$3,898 676 kW-months/year |
$1,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $10,263 Cost: $17,000 |
$10,263 | 313,589 | - | - | - | - |
$10,263 313,589 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,269 Cost: $3,800 |
$3,269 | 99,076 | - | - | - | - |
$3,269 99,076 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,713 Cost: $9,934 |
$4,969 | 150,596 | $1,665 | 290 | $1,079 | - |
$4,969 150,596 kWh |
$1,665 290 kW-months/year |
$1,079 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,661 Cost: $150,734 |
$26,519 | 835,876 | $5,563 | 966 | $2,579 | - | $26,519 835,876 kWh |
$5,563 966 kW-months/year |
$2,579 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,661 Cost: $150,734 |
$26,519 | 835,876 | $5,563 | 966 | $2,579 | - | $26,519 835,876 kWh |
$5,563 966 kW-months/year |
$2,579 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |