IAC Assessment: UW0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2010
Principal Product Metal Finishers, X-Ray Laboratory
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 18,000
Annual Production 50,000 Pieces
Production Hrs. Annual 4,992
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,090 1,463,960 kWh $0.07
Electricity Demand $3,533 3,430 kW-months/year $1.03
Natural Gas $35,161 28,249 MMBtu $1.24
TOTAL ENERGY COSTS $147,678
RECOMMENDED SAVINGS* $23,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $429
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,132
Cost:
-
$1,834 54,176 $772 11 $6,526 55 - - $1,834
54,176
kWh
$772
11
kW-months/year
$6,526
55
MMBtu
-
-
gal
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$7,344
Cost:
-
- - - - - - $7,344 1,361 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,344
1,361
gal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,340
Cost:
-
$5,195 153,459 - - - - $145 68,065 $5,195
153,459
kWh
-
-
kW-months/year
-
-
MMBtu
$145
68,065
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$620
Cost:
-
$436 12,879 $184 2 - - - - $436
12,879
kWh
$184
2
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$429
Cost:
-
$346 10,211 $83 1 - - - - $346
10,211
kWh
$83
1
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$292
Cost:
-
$292 8,626 - - - - - - $292
8,626
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$23,157
Cost:
-
$8,103 239,351 $1,039 14 $6,526 55 $7,489 69,426 $8,103
239,351
kWh
$1,039
14
kW-months/year
$6,526
55
MMBtu
$7,489
69,426
gal
TOTAL IMPLEMENTED Savings:
$429
Cost:
-
$346 10,211 $83 1 - - - - $346
10,211
kWh
$83
1
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)