Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2010 |
Principal Product | Composites |
NAICS | 325314 - Fertilizer (Mixing Only) Manufacturing |
SIC | 2875 - Fertilizers, Mixing Only |
Sales | $50,000,000-$100,000,000 |
# of Employees | 108 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,620 | 952,332 | kWh | $0.07 |
Electricity Demand | $13,764 | 2,640 | kW-months/year | $5.21 |
Natural Gas | $93,096 | 8,994 | MMBtu | $10.35 |
TOTAL ENERGY COSTS | $174,480 | |||
RECOMMENDED SAVINGS* | $4,341 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,420 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,711 Cost: $1,060 |
$3,437 | 38,189 | $574 | 110 | - | - | $(-1,300) | - |
$3,437 38,189 kWh |
$574 110 kW-months/year |
- - MMBtu |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $709 Cost: - |
- | - | $709 | 136 | - | - | - | - |
- - kWh |
$709 136 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $921 Cost: $1,842 |
- | - | - | - | $921 | 93 | - | - |
- - kWh |
- - kW-months/year |
$921 93 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $4,341 Cost: $2,902 |
$3,437 | 38,189 | $1,283 | 246 | $921 | 93 | $(-1,300) | - | $3,437 38,189 kWh |
$1,283 246 kW-months/year |
$921 93 MMBtu |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,420 Cost: $1,060 |
$3,437 | 38,189 | $1,283 | 246 | - | - | $(-1,300) | - | $3,437 38,189 kWh |
$1,283 246 kW-months/year |
- - MMBtu |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |