IAC logo
IAC Assessment: UW2206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2022
Principal Product Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 32,000
Annual Production 5,000 Units
Production Hrs. Annual 4,160
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,162 3,152,700 kWh $0.08
Electricity Demand $19,408 4,840 kW-months/year $4.01
Electricity Fees $1,912 - $ -
Natural Gas $60,657 6,455 MMBtu $9.40
TOTAL ENERGY COSTS $539,938
RECOMMENDED SAVINGS* $12,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,718
Cost:
-
$5,352 66,656 $366 91 - - $5,352
66,656
kWh
$366
91
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$567
Cost:
$122
$531 6,608 $36 9 - - $531
6,608
kWh
$36
9
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$999
Cost:
$2,199
$989 12,311 $11 3 - - $989
12,311
kWh
$11
3
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,058
Cost:
$2,080
$3,741 46,590 $317 79 - - $3,741
46,590
kWh
$317
79
kW-months/year
-
-
MMBtu
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$782
Cost:
-
- - - - $782 83 -
-
kWh
-
-
kW-months/year
$782
83
MMBtu
TOTAL RECOMMENDED Savings:
$12,125
Cost:
$4,401
$10,612 132,165 $731 182 $782 83 $10,612
132,165
kWh
$731
182
kW-months/year
$782
83
MMBtu
TOTAL IMPLEMENTED Savings:
$12,125
Cost:
$4,401
$10,612 132,165 $731 182 $782 83 $10,612
132,165
kWh
$731
182
kW-months/year
$782
83
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas