IAC logo
IAC Assessment: UW2303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
NAICS 311824 - Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2051 - Bread, Cake, And Related Products
Sales $500,000-$1,000,000
# of Employees 62
Plant Area (Sq.Ft.) 126,462
Annual Production 60,000 Pounds
Production Hrs. Annual 4,284
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,938 920,229 kWh $0.08
Electricity Demand $23,567 5,443 kW-months/year $4.33
Electricity Fees $997 - $ -
Natural Gas $5,090 432 MMBtu $11.78
TOTAL ENERGY COSTS $158,192
RECOMMENDED SAVINGS* $8,423 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$687
Cost:
$1,488
$601 7,382 $86 20 - - $601
7,382
kWh
$86
20
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$590
Cost:
$124
$590 7,242 - - - - $590
7,242
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,161
Cost:
$624
$3,641 44,725 $520 120 - - $3,641
44,725
kWh
$520
120
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$702
Cost:
$959
$611 7,507 $91 21 - - $611
7,507
kWh
$91
21
kW-months/year
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$199
Cost:
$282
$176 1,877 $23 5 - - $176
1,877
kWh
$23
5
kW-months/year
-
-
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,084
Cost:
$5,025
- - - - $2,084 177 -
-
kWh
-
-
kW-months/year
$2,084
177
MMBtu
TOTAL RECOMMENDED Savings:
$8,423
Cost:
$8,502
$5,619 68,733 $720 166 $2,084 177 $5,619
68,733
kWh
$720
166
kW-months/year
$2,084
177
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas