IAC logo
IAC Assessment: UW2304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Paper (liner, board, and medium), pulp
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 317
Plant Area (Sq.Ft.) 700,000
Annual Production 300,000 Tons
Production Hrs. Annual 8,592
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,585,004 80,984,000 kWh $0.04
Electricity Demand $239,476 21,148 kW-months/year $11.32
Electricity Fees $(-528,220) - $ -
TOTAL ENERGY COSTS $3,296,260
RECOMMENDED SAVINGS* $184,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $183,786
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$28,885
Cost:
-
$21,282 480,722 $7,603 671 - - $21,282
480,722
kWh
$7,603
671
kW-months/year
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,854
Cost:
$372
$4,313 97,432 $1,541 136 - - $4,313
97,432
kWh
$1,541
136
kW-months/year
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$148,199
Cost:
$381,066
$33,177 748,915 $11,822 1,044 $103,200 - $33,177
748,915
kWh
$11,822
1,044
kW-months/year
$103,200
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$848
Cost:
$937
$625 14,114 $223 20 - - $625
14,114
kWh
$223
20
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$231
Cost:
$332
$231 5,234 - - - - $231
5,234
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$184,017
Cost:
$382,707
$59,628 1,346,417 $21,189 1,871 $103,200 - $59,628
1,346,417
kWh
$21,189
1,871
kW-months/year
$103,200
-
$
TOTAL IMPLEMENTED Savings:
$183,786
Cost:
$382,375
$59,397 1,341,183 $21,189 1,871 $103,200 - $59,397
1,341,183
kWh
$21,189
1,871
kW-months/year
$103,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost