IAC logo
IAC Assessment: UW2305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Ready-Mix Concrete Manufacturing
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 64,965
Annual Production 250,000 Pounds
Production Hrs. Annual 3,120
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $368,268 7,753,000 kWh $0.05
Electricity Demand $556,066 44,308 kW-months/year $12.55
Electricity Fees $123,153 - $ -
Natural Gas $38,719 6,384 MMBtu $6.07
TOTAL ENERGY COSTS $1,086,206
RECOMMENDED SAVINGS* $6,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,116
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$704
Cost:
$4,074
$279 5,882 $425 34 - - - - $279
5,882
kWh
$425
34
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$3,266
Cost:
$4,565
$214 4,499 $217 17 - - $2,835 - $214
4,499
kWh
$217
17
kW-months/year
-
-
MMBtu
$2,835
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,115
Cost:
$5,102
$553 11,638 $562 45 - - - - $553
11,638
kWh
$562
45
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,031
Cost:
-
- - - - $1,031 170 - - -
-
kWh
-
-
kW-months/year
$1,031
170
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,116
Cost:
$13,741
$1,046 22,019 $1,204 96 $1,031 170 $2,835 - $1,046
22,019
kWh
$1,204
96
kW-months/year
$1,031
170
MMBtu
$2,835
-
$
TOTAL IMPLEMENTED Savings:
$6,116
Cost:
$13,741
$1,046 22,019 $1,204 96 $1,031 170 $2,835 - $1,046
22,019
kWh
$1,204
96
kW-months/year
$1,031
170
MMBtu
$2,835
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes