IAC Assessment: UW2310
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2310
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Other Aircraft Parts and Auxiliary Equipment Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 88,000
Annual Production 682,892 Units
Production Hrs. Annual 6,864
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,327 1,775,100 kWh $0.07
Electricity Demand $25,975 4,942 kW-months/year $5.26
Electricity Fees $9,620 - $ -
Natural Gas $105,774 9,561 MMBtu $11.06
LPG $1,798 77 MMBtu $23.35
TOTAL ENERGY COSTS $271,494
RECOMMENDED SAVINGS* $196,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$29,254
Cost:
$128,809
- - - - $29,254 2,645 - - -
-
kWh
-
-
kW-months/year
$29,254
2,645
MMBtu
-
-
%
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$153,154
Cost:
$859,050
$2,776 38,556 $378 72 - - $150,000 - $2,776
38,556
kWh
$378
72
kW-months/year
-
-
MMBtu
$150,000
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,425
Cost:
$1,000
$3,109 43,183 $316 60 - - - - $3,109
43,183
kWh
$316
60
kW-months/year
-
-
MMBtu
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,210
Cost:
$16,378
$9,190 103,494 $1,020 153 - - - - $9,190
103,494
kWh
$1,020
153
kW-months/year
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$196,043
Cost:
$1,005,237
$15,075 185,233 $1,714 285 $29,254 2,645 $150,000 - $15,075
185,233
kWh
$1,714
285
kW-months/year
$29,254
2,645
MMBtu
$150,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production