IAC logo
IAC Assessment: UW2311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Other Aircraft Parts and Auxiliary Equipment Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 268
Plant Area (Sq.Ft.) 20,000
Annual Production 50,000 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $285,992 3,942,700 kWh $0.07
Electricity Demand $85,037 15,489 kW-months/year $5.49
Electricity Fees $19,109 - $ -
Natural Gas $63,355 7,658 MMBtu $8.27
TOTAL ENERGY COSTS $453,493
RECOMMENDED SAVINGS* $157,389 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,427
Cost:
$15,722
$(-2,009) (-27,716) $(-694) (-126) $9,130 1,104 $(-2,009)
(-27,716)
kWh
$(-694)
(-126)
kW-months/year
$9,130
1,104
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,668
Cost:
$83,148
$24,162 333,267 $2,506 456 - - $24,162
333,267
kWh
$2,506
456
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$470
Cost:
$2,080
$426 5,876 $44 8 - - $426
5,876
kWh
$44
8
kW-months/year
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$112,574
Cost:
$693,588
$101,994 1,406,815 $10,580 1,927 - - $101,994
1,406,815
kWh
$10,580
1,927
kW-months/year
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,250
Cost:
$49,905
- - $11,250 2,049 - - -
-
kWh
$11,250
2,049
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$157,389
Cost:
$844,443
$124,573 1,718,242 $23,686 4,314 $9,130 1,104 $124,573
1,718,242
kWh
$23,686
4,314
kW-months/year
$9,130
1,104
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas