Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2024 |
Principal Product | Pharmaceutical Preparation Manufacturing |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 81 |
Plant Area (Sq.Ft.) | 108,300 |
Annual Production | 72 Units |
Production Hrs. Annual | 6,387 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $267,097 | 3,760,163 | kWh | $0.07 |
Electricity Demand | $38,084 | 7,757 | kW-months/year | $4.91 |
Electricity Fees | $32,674 | - | $ | - |
Natural Gas | $57,672 | 4,191 | MMBtu | $13.76 |
TOTAL ENERGY COSTS | $395,527 | |||
RECOMMENDED SAVINGS* | $177,482 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,442 Cost: $5,083 |
$14,106 | 198,677 | $1,336 | 272 | - | - | - | - | - | - |
$14,106 198,677 kWh |
$1,336 272 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,045 Cost: $582 |
$1,868 | 26,306 | $177 | 36 | - | - | - | - | - | - |
$1,868 26,306 kWh |
$177 36 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $282 Cost: $1,742 |
$258 | 3,630 | $24 | 5 | - | - | - | - | - | - |
$258 3,630 kWh |
$24 5 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $55,000 Cost: $117,000 |
- | - | - | - | - | - | - | - | $55,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$55,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS |
Savings: $25,000 Cost: $104,000 |
- | - | - | - | - | - | $25,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$25,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $17,310 Cost: $375 |
- | - | - | - | $17,310 | 1,258 | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,310 1,258 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $13,327 Cost: $84,652 |
$12,173 | 171,462 | $1,154 | 235 | - | - | - | - | - | - |
$12,173 171,462 kWh |
$1,154 235 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $49,076 Cost: $311,400 |
$44,828 | 631,386 | $4,248 | 865 | - | - | - | - | - | - |
$44,828 631,386 kWh |
$4,248 865 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $177,482 Cost: $624,834 |
$73,233 | 1,031,461 | $6,939 | 1,413 | $17,310 | 1,258 | $25,000 | - | $55,000 | - | $73,233 1,031,461 kWh |
$6,939 1,413 kW-months/year |
$17,310 1,258 MMBtu |
$25,000 - $ |
$55,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |