IAC Assessment: UW2402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Pharmaceutical Preparation Manufacturing
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 81
Plant Area (Sq.Ft.) 108,300
Annual Production 72 Units
Production Hrs. Annual 6,387
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $267,097 3,760,163 kWh $0.07
Electricity Demand $38,084 7,757 kW-months/year $4.91
Electricity Fees $32,674 - $ -
Natural Gas $57,672 4,191 MMBtu $13.76
TOTAL ENERGY COSTS $395,527
RECOMMENDED SAVINGS* $177,482 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $177,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,442
Cost:
$5,083
$14,106 198,677 $1,336 272 - - - - - - $14,106
198,677
kWh
$1,336
272
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,045
Cost:
$582
$1,868 26,306 $177 36 - - - - - - $1,868
26,306
kWh
$177
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$282
Cost:
$1,742
$258 3,630 $24 5 - - - - - - $258
3,630
kWh
$24
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$55,000
Cost:
$117,000
- - - - - - - - $55,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$55,000
-
$
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$25,000
Cost:
$104,000
- - - - - - $25,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,000
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$17,310
Cost:
$375
- - - - $17,310 1,258 - - - - -
-
kWh
-
-
kW-months/year
$17,310
1,258
MMBtu
-
-
$
-
-
$
07: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$13,327
Cost:
$84,652
$12,173 171,462 $1,154 235 - - - - - - $12,173
171,462
kWh
$1,154
235
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$49,076
Cost:
$311,400
$44,828 631,386 $4,248 865 - - - - - - $44,828
631,386
kWh
$4,248
865
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$177,482
Cost:
$624,834
$73,233 1,031,461 $6,939 1,413 $17,310 1,258 $25,000 - $55,000 - $73,233
1,031,461
kWh
$6,939
1,413
kW-months/year
$17,310
1,258
MMBtu
$25,000
-
$
$55,000
-
$
TOTAL IMPLEMENTED Savings:
$177,200
Cost:
$623,092
$72,975 1,027,831 $6,915 1,408 $17,310 1,258 $25,000 - $55,000 - $72,975
1,027,831
kWh
$6,915
1,408
kW-months/year
$17,310
1,258
MMBtu
$25,000
-
$
$55,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost