IAC Assessment: UW2403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Unlaminated Plastics Film and Sheet (except Packaging)
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 14,910
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,486,336 21,629,600 kWh $0.07
Electricity Demand $311,058 47,158 kW-months/year $6.60
Electricity Fees $473 - $ -
Natural Gas $247,773 28,154 MMBtu $8.80
TOTAL ENERGY COSTS $2,045,640
RECOMMENDED SAVINGS* $293,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,480
Cost:
$4,010
- - - - $8,480 964 -
-
kWh
-
-
kW-months/year
$8,480
964
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,147
Cost:
$4,257
$2,781 40,472 $366 55 - - $2,781
40,472
kWh
$366
55
kW-months/year
-
-
MMBtu
03: 4.663 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD Savings:
$222,893
Cost:
$500,000
$222,893 3,244,440 - - - - $222,893
3,244,440
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,988
Cost:
$1,080
$15,186 221,040 $2,802 425 - - $15,186
221,040
kWh
$2,802
425
kW-months/year
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,319
Cost:
$720
$1,319 19,200 - - - - $1,319
19,200
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$6,846
Cost:
$30,000
- - - - $6,846 778 -
-
kWh
-
-
kW-months/year
$6,846
778
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$8,794
Cost:
$58,500
$8,794 128,000 - - - - $8,794
128,000
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$24,078
Cost:
$36,400
$19,421 282,694 $4,657 706 - - $19,421
282,694
kWh
$4,657
706
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$293,545
Cost:
$634,967
$270,394 3,935,846 $7,825 1,186 $15,326 1,742 $270,394
3,935,846
kWh
$7,825
1,186
kW-months/year
$15,326
1,742
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas