Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2024 |
Principal Product | Solide stile and rail wood doors |
NAICS | 321911 - Wood Window and Door Manufacturing |
SIC | 2431 - Millwork |
Sales | $50,000,000-$100,000,000 |
# of Employees | 216 |
Plant Area (Sq.Ft.) | 356,760 |
Annual Production | 70,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $617,253 | 10,079,000 | kWh | $0.06 |
Electricity Demand | $284,955 | 36,900 | kW-months/year | $7.72 |
Electricity Fees | $89,227 | - | $ | - |
LPG | $227,211 | 14,726 | MMBtu | $15.43 |
TOTAL ENERGY COSTS | $1,270,976 | |||
RECOMMENDED SAVINGS* | $495,245 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Electricity Usage | Electricity Demand | Electricity Fees | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $13,069 Cost: $103,000 |
- | - | - | - | - | - | $13,069 | 847 |
- - kWh |
- - kW-months/year |
- - $ |
$13,069 847 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $116,105 Cost: $13,500 |
- | - | - | - | - | - | $116,105 | 7,525 |
- - kWh |
- - kW-months/year |
- - $ |
$116,105 7,525 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,014 Cost: - |
$5,277 | 86,226 | $2,737 | 354 | - | - | - | - |
$5,277 86,226 kWh |
$2,737 354 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $32,306 Cost: $2,080 |
$26,082 | 426,174 | $6,224 | 806 | - | - | - | - |
$26,082 426,174 kWh |
$6,224 806 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $45,697 Cost: $89,919 |
- | - | $26,778 | 3,464 | $18,919 | - | - | - |
- - kWh |
$26,778 3,464 kW-months/year |
$18,919 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $35,732 Cost: $2,619 |
$35,732 | 583,858 | - | - | - | - | - | - |
$35,732 583,858 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $34,834 Cost: $133,560 |
$34,834 | 569,176 | - | - | - | - | - | - |
$34,834 569,176 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2123 INSULATE FEEDWATER TANK |
Savings: $2,901 Cost: $290 |
- | - | - | - | - | - | $2,901 | 188 |
- - kWh |
- - kW-months/year |
- - $ |
$2,901 188 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $61,411 Cost: $421,830 |
$52,361 | 855,564 | $9,050 | 1,172 | - | - | - | - |
$52,361 855,564 kWh |
$9,050 1,172 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $145,176 Cost: $144,799 |
$84,015 | 1,372,800 | $61,161 | 7,920 | - | - | - | - |
$84,015 1,372,800 kWh |
$61,161 7,920 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $495,245 Cost: $911,597 |
$238,301 | 3,893,798 | $105,950 | 13,716 | $18,919 | - | $132,075 | 8,560 | $238,301 3,893,798 kWh |
$105,950 13,716 kW-months/year |
$18,919 - $ |
$132,075 8,560 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||