IAC logo
IAC Assessment: UW2409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Beverage Manufacturing
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 246
Plant Area (Sq.Ft.) 283,711
Annual Production 217,000,000 Units
Production Hrs. Annual 7,488
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $628,297 8,925,880 kWh $0.07
Electricity Demand $298,295 23,834 kW-months/year $12.52
Electricity Fees $112,996 - $ -
Natural Gas $548,221 62,636 MMBtu $8.75
TOTAL ENERGY COSTS $1,868,257
RECOMMENDED SAVINGS* $1,452,455 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Natural Gas Water Usage Natural Gas Water Usage
$ MMBtu $ Tgal
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$240,871
Cost:
$7,750
$240,871 27,520 - - $240,871
27,520
MMBtu
-
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,927
Cost:
$2,080
$1,927 220 - - $1,927
220
MMBtu
-
-
Tgal
03: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$1,034,601
Cost:
$300,000
- - $1,034,601 84,429 -
-
MMBtu
$1,034,601
84,429
Tgal
04: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$16,446
Cost:
$18,600
$16,446 1,879 - - $16,446
1,879
MMBtu
-
-
Tgal
05: 2.1224 REPLACE BOILER Savings:
$61,679
Cost:
$155,400
$61,679 7,047 - - $61,679
7,047
MMBtu
-
-
Tgal
06: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$72,261
Cost:
$271,830
$72,261 8,256 - - $72,261
8,256
MMBtu
-
-
Tgal
07: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$24,670
Cost:
$223,625
$24,670 2,819 - - $24,670
2,819
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$1,452,455
Cost:
$979,285
$417,854 47,741 $1,034,601 84,429 $417,854
47,741
MMBtu
$1,034,601
84,429
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
MMBtu
-
-
Tgal
Savings
Cost
$ MMBtu $ Tgal
Natural Gas Water Usage Natural Gas Water Usage