IAC Assessment: UW2412
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2412
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Softwood Building Products
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 46
Plant Area (Sq.Ft.) 165,000
Annual Production 32,200 Units
Production Hrs. Annual 6,205
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,406 2,279,700 kWh $0.08
Electricity Demand $60,100 9,894 kW-months/year $6.07
Electricity Fees $15,461 - $ -
Natural Gas $20,150 5,637 MMBtu $3.57
Other Gas $22,159 5,637 MMBtu $3.93
TOTAL ENERGY COSTS $297,276
RECOMMENDED SAVINGS* $35,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$6,073
Cost:
$3,600
- - - - $6,073 1,699 - - -
-
kWh
-
-
kW-months/year
$6,073
1,699
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$815
Cost:
$4,530
- - - - $815 228 - - -
-
kWh
-
-
kW-months/year
$815
228
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,336
Cost:
$2,080
$4,826 61,320 $510 84 - - - - $4,826
61,320
kWh
$510
84
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,335
Cost:
-
$1,206 15,520 $129 21 - - - - $1,206
15,520
kWh
$129
21
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,420
Cost:
$1,600
- - - - $2,420 677 - - -
-
kWh
-
-
kW-months/year
$2,420
677
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,451
Cost:
$2,000
$523 6,643 $78 13 - - $7,850 - $523
6,643
kWh
$78
13
kW-months/year
-
-
MMBtu
$7,850
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,042
Cost:
$6,294
$6,997 88,908 $1,045 172 - - - - $6,997
88,908
kWh
$1,045
172
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,736
Cost:
$2,075
$2,481 31,529 $255 42 - - - - $2,481
31,529
kWh
$255
42
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,208
Cost:
$22,179
$16,033 203,920 $2,017 332 $9,308 2,604 $7,850 - $16,033
203,920
kWh
$2,017
332
kW-months/year
$9,308
2,604
MMBtu
$7,850
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost