IAC logo
IAC Assessment: UW2413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Slude, Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 4
Plant Area (Sq.Ft.) 210,000
Annual Production 40,150 Thousand Gallons
Production Hrs. Annual 3,822
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,968 2,770,827 kWh $0.03
Electricity Demand $40,056 5,932 kW-months/year $6.75
Electricity Fees $10,366 - $ -
Fuel Oil #1 $10,300 290 MMBtu $35.52
TOTAL ENERGY COSTS $136,690
RECOMMENDED SAVINGS* $70,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$8,896
Cost:
$25,250
- - - - $8,896 230 - - -
-
kWh
-
-
kW-months/year
$8,896
230
MMBtu
-
-
$
02: 4.663 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD Savings:
$25,793
Cost:
$13,368
$15,194 554,165 - - - - $10,599 - $15,194
554,165
kWh
-
-
kW-months/year
-
-
MMBtu
$10,599
-
$
03: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$20,435
Cost:
$58,800
$19,868 735,840 $567 84 - - - - $19,868
735,840
kWh
$567
84
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,186
Cost:
$5,713
$12,186 444,738 - - - - - - $12,186
444,738
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$53
Cost:
$229
$53 1,971 - - - - - - $53
1,971
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,582
Cost:
$7,250
$3,582 130,645 - - - - - - $3,582
130,645
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$70,945
Cost:
$110,610
$50,883 1,867,359 $567 84 $8,896 230 $10,599 - $50,883
1,867,359
kWh
$567
84
kW-months/year
$8,896
230
MMBtu
$10,599
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost