Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Fresh and Frozen Seafood
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2091 - Canned And Cured Fish And Seafoods
Sales $50,000,000-$100,000,000
# of Employees 117
Plant Area (Sq.Ft.) 50,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 6,552
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,280 2,096,000 kWh $0.06
Electricity Demand $338,085 7,227 kW-months/year $46.78
Electricity Fees $(-31,898) - $ -
Natural Gas $29,123 2,514 MMBtu $11.58
LPG $44,444 1,036 MMBtu $42.90
Fuel Oil #1 $16,855 620 MMBtu $27.19
TOTAL ENERGY COSTS $756,636
RECOMMENDED SAVINGS* $2,609,167 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Water Usage Water Disposal One-time Revenue or Avoided Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas LPG Water Usage Water Disposal One-time Revenue or Avoided Cost Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ Tgal $ $ $ $ $ %
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,616
Cost:
$2,203
$1,616 27,905 - - - - - - - - - - - - - - - - $1,616
27,905
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$7,755
Cost:
$3,047
$7,755 133,933 - - - - - - - - - - - - - - - - $7,755
133,933
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$60,318
Cost:
$7,015
$21,769 375,969 $38,549 824 - - - - - - - - - - - - - - $21,769
375,969
kWh
$38,549
824
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
04: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$1,150,001
Cost:
$380,750
- - - - - - - - - - - - - - $1,150,000 - $1 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
$1,150,000
-
$
$1
-
%
05: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT Savings:
$1,080,000
Cost:
$870,000
- - - - - - - - - - - - - - - - $1,080,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
$1,080,000
-
%
06: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$100,020
Cost:
$225,274
- - - - - - - - $20 3 - - - - $100,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$20
3
Tgal
-
-
Tgal
-
-
$
$100,000
-
$
-
-
%
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,888
Cost:
$25,000
$5,947 102,782 $10,941 234 - - - - - - - - - - - - - - $5,947
102,782
kWh
$10,941
234
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,441
Cost:
$20,000
$2,102 36,305 $2,339 50 - - - - - - - - - - - - - - $2,102
36,305
kWh
$2,339
50
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,064
Cost:
$195,867
$29,064 502,279 - - - - - - - - - - - - - - - - $29,064
502,279
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
10: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$32,733
Cost:
$55,000
- - - - - - - - $246 37 $365 37 $4,522 - - - $27,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$246
37
Tgal
$365
37
Tgal
$4,522
-
$
-
-
$
$27,600
-
%
11: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$64,033
Cost:
$47,500
$14,563 251,520 $40,571 867 $3,566 308 $5,333 124 - - - - - - - - - - $14,563
251,520
kWh
$40,571
867
kW-months/year
$3,566
308
MMBtu
$5,333
124
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
12: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$62,298
Cost:
$19,622
$4,109 71,024 $(-22,239) (-475) - - - - - - - - $80,428 - - - - - $4,109
71,024
kWh
$(-22,239)
(-475)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$80,428
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$2,609,167
Cost:
$1,851,278
$86,925 1,501,717 $70,161 1,500 $3,566 308 $5,333 124 $266 40 $365 37 $84,950 - $1,250,000 - $1,107,601 - $86,925
1,501,717
kWh
$70,161
1,500
kW-months/year
$3,566
308
MMBtu
$5,333
124
MMBtu
$266
40
Tgal
$365
37
Tgal
$84,950
-
$
$1,250,000
-
$
$1,107,601
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas LPG Water Usage Water Disposal One-time Revenue or Avoided Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas LPG Water Usage Water Disposal One-time Revenue or Avoided Cost Primary Product Increase in Production