IAC logo
IAC Assessment: UW2501
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2025
Principal Product Soups, Meats, Sauces
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 385
Plant Area (Sq.Ft.) 300,000
Annual Production 3,100,000 Pounds
Production Hrs. Annual 8,568
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,278,627 17,047,200 kWh $0.08
Electricity Demand $207,487 31,879 kW-months/year $6.51
Electricity Fees $11,857 - $ -
Natural Gas $304,077 101,314 MMBtu $3.00
TOTAL ENERGY COSTS $2,396,645
RECOMMENDED SAVINGS* $153,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$41,957
Cost:
$25,000
$37,499 499,986 $4,458 685 - - $37,499
499,986
kWh
$4,458
685
kW-months/year
-
-
MMBtu
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$83,082
Cost:
$9,800
- - - - $83,082 27,682 -
-
kWh
-
-
kW-months/year
$83,082
27,682
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,699
Cost:
$6,545
$7,765 103,531 $934 144 - - $7,765
103,531
kWh
$934
144
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,175
Cost:
$10,269
$11,758 156,777 $1,417 218 - - $11,758
156,777
kWh
$1,417
218
kW-months/year
-
-
MMBtu
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,682
Cost:
$32,756
$6,616 88,213 $66 10 - - $6,616
88,213
kWh
$66
10
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$153,595
Cost:
$84,370
$63,638 848,507 $6,875 1,056 $83,082 27,682 $63,638
848,507
kWh
$6,875
1,056
kW-months/year
$83,082
27,682
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas