IAC logo
IAC Assessment: UW2506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2025
Principal Product Aircraft Engine and Parts Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 104,935
Annual Production 50,000 Pieces
Production Hrs. Annual 3,250
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,850 843,710 kWh $0.09
Electricity Demand $7,896 1,998 kW-months/year $3.95
Electricity Fees $6,550 - $ -
Natural Gas $32,578 2,749 MMBtu $11.85
Other Gas $3,617 1 MMBtu $3,617.00
TOTAL ENERGY COSTS $125,491
RECOMMENDED SAVINGS* $115,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$8,164
Cost:
$187,200
$2,882 32,496 $79 20 $5,203 390 $2,882
32,496
kWh
$79
20
kW-months/year
$5,203
390
MMBtu
02: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS Savings:
$14,113
Cost:
$1,255
- - - - $14,113 1,059 -
-
kWh
-
-
kW-months/year
$14,113
1,059
MMBtu
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$75,836
Cost:
$644,978
$74,811 843,418 $1,025 260 - - $74,811
843,418
kWh
$1,025
260
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,688
Cost:
$54,000
- - - - $6,688 502 -
-
kWh
-
-
kW-months/year
$6,688
502
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,528
Cost:
$15,530
$2,171 24,479 $357 90 - - $2,171
24,479
kWh
$357
90
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,019
Cost:
$7,709
$6,019 67,860 - - - - $6,019
67,860
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,155
Cost:
$25,000
$1,777 20,030 $378 96 - - $1,777
20,030
kWh
$378
96
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$115,503
Cost:
$935,672
$87,660 988,283 $1,839 466 $26,004 1,951 $87,660
988,283
kWh
$1,839
466
kW-months/year
$26,004
1,951
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas