Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Electroplating & Anodizing of miscellaneous parts
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 95,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $322,341 2,908,558 kWh $0.11
Natural Gas $144,738 45,506 MMBtu $3.18
TOTAL ENERGY COSTS $467,079
RECOMMENDED SAVINGS* $59,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,839
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ MMBtu $ lb $ lb
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,288
Cost:
$10,000
- - $19,288 6,066 - - - - -
-
kWh
$19,288
6,066
MMBtu
-
-
lb
-
-
lb
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$16,124
Cost:
$500
- - $16,124 5,070 - - - - -
-
kWh
$16,124
5,070
MMBtu
-
-
lb
-
-
lb
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,431
Cost:
$1,400
- - $1,431 450 - - - - -
-
kWh
$1,431
450
MMBtu
-
-
lb
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$491
Cost:
$1,920
$491 4,396 - - - - - - $491
4,396
kWh
-
-
MMBtu
-
-
lb
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$488
Cost:
-
$488 4,103 - - - - - - $488
4,103
kWh
-
-
MMBtu
-
-
lb
-
-
lb
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$18,227
Cost:
$66,000
- - - - $18,227 306,000 - - -
-
kWh
-
-
MMBtu
$18,227
306,000
lb
-
-
lb
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$3,499
Cost:
$6,000
- - - - - - $3,499 1,119,475 -
-
kWh
-
-
MMBtu
-
-
lb
$3,499
1,119,475
lb
TOTAL RECOMMENDED Savings:
$59,548
Cost:
$85,820
$979 8,499 $36,843 11,586 $18,227 306,000 $3,499 1,119,475 $979
8,499
kWh
$36,843
11,586
MMBtu
$18,227
306,000
lb
$3,499
1,119,475
lb
TOTAL IMPLEMENTED Savings:
$34,839
Cost:
$66,500
$488 4,103 $16,124 5,070 $18,227 306,000 - - $488
4,103
kWh
$16,124
5,070
MMBtu
$18,227
306,000
lb
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz)