IAC Assessment: WI0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Stainless Vessels Product
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 12,000 Pieces
Production Hrs. Annual 2,190
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,056 2,035,463 kWh $0.06
Electricity Demand $58,858 8,016 kW-months/year $7.34
Electricity Fees $4,058 - $ -
Natural Gas $49,262 11,199 MMBtu $4.40
TOTAL ENERGY COSTS $230,234
RECOMMENDED SAVINGS* $34,376 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,063
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,926
Cost:
$4,400
- - - - - - $9,926 2,256 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,926
2,256
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,406
Cost:
$50,000
$8,882 326,788 $10,353 1,343 - - $(-9,829) (-2,234) - - $8,882
326,788
kWh
$10,353
1,343
kW-months/year
-
-
$
$(-9,829)
(-2,234)
MMBtu
-
-
lb
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,447
Cost:
-
- - - - $7,447 - - - - - -
-
kWh
-
-
kW-months/year
$7,447
-
$
-
-
MMBtu
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,690
Cost:
$1,600
- - - - - - $1,690 384 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,690
384
MMBtu
-
-
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,800
Cost:
-
- - - - - - - - $4,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,800
-
lb
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,107
Cost:
$500
- - - - - - $1,107 252 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,107
252
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$34,376
Cost:
$56,500
$8,882 326,788 $10,353 1,343 $7,447 - $2,894 658 $4,800 - $8,882
326,788
kWh
$10,353
1,343
kW-months/year
$7,447
-
$
$2,894
658
MMBtu
$4,800
-
lb
TOTAL IMPLEMENTED Savings:
$19,063
Cost:
$6,000
- - - - $7,447 - $11,616 2,640 - - -
-
kWh
-
-
kW-months/year
$7,447
-
$
$11,616
2,640
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)