Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Forgings (tractor/off road)
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 175,000
Annual Production 500 Pieces
Production Hrs. Annual 3,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,737 2,820,926 kWh $0.03
Electricity Demand $85,652 11,487 kW-months/year $7.46
Electricity Fees $(-2,579) - $ -
Natural Gas $536,714 220,801 MMBtu $2.43
TOTAL ENERGY COSTS $693,524
RECOMMENDED SAVINGS* $19,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$6,680
Cost:
$2,500
- - - - $2,790 1,140 $2,280 - $1,610 - -
-
kWh
-
-
kW-months/year
$2,790
1,140
MMBtu
$2,280
-
$
$1,610
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,481
Cost:
$30,000
$8,646 315,651 $6,572 840 $(-8,737) (-3,596) - - - - $8,646
315,651
kWh
$6,572
840
kW-months/year
$(-8,737)
(-3,596)
MMBtu
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,572
Cost:
$1,280
$848 31,067 $724 92 - - - - - - $848
31,067
kWh
$724
92
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$899
Cost:
$600
- - - - $899 370 - - - - -
-
kWh
-
-
kW-months/year
$899
370
MMBtu
-
-
$
-
-
Tgal
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,072
Cost:
$1,800
- - - - $2,072 853 - - - - -
-
kWh
-
-
kW-months/year
$2,072
853
MMBtu
-
-
$
-
-
Tgal
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$150
Cost:
$250
- - - - $150 62 - - - - -
-
kWh
-
-
kW-months/year
$150
62
MMBtu
-
-
$
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,546
Cost:
$1,220
$696 25,498 $850 109 - - - - - - $696
25,498
kWh
$850
109
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$440
Cost:
-
$197 7,327 $243 31 - - - - - - $197
7,327
kWh
$243
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$19,840
Cost:
$37,650
$10,387 379,543 $8,389 1,072 $(-2,826) (-1,171) $2,280 - $1,610 - $10,387
379,543
kWh
$8,389
1,072
kW-months/year
$(-2,826)
(-1,171)
MMBtu
$2,280
-
$
$1,610
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,780
Cost:
$4,550
$1,741 63,892 $1,817 232 $2,222 915 - - - - $1,741
63,892
kWh
$1,817
232
kW-months/year
$2,222
915
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal