Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1996 |
Principal Product | Forgings (tractor/off road) |
NAICS | n/a |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 175,000 |
Annual Production | 500 Pieces |
Production Hrs. Annual | 3,760 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,737 | 2,820,926 | kWh | $0.03 |
Electricity Demand | $85,652 | 11,487 | kW-months/year | $7.46 |
Electricity Fees | $(-2,579) | - | $ | - |
Natural Gas | $536,714 | 220,801 | MMBtu | $2.43 |
TOTAL ENERGY COSTS | $693,524 | |||
RECOMMENDED SAVINGS* | $19,840 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,780 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT |
Savings: $6,680 Cost: $2,500 |
- | - | - | - | $2,790 | 1,140 | $2,280 | - | $1,610 | - |
- - kWh |
- - kW-months/year |
$2,790 1,140 MMBtu |
$2,280 - $ |
$1,610 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,481 Cost: $30,000 |
$8,646 | 315,651 | $6,572 | 840 | $(-8,737) | (-3,596) | - | - | - | - |
$8,646 315,651 kWh |
$6,572 840 kW-months/year |
$(-8,737) (-3,596) MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,572 Cost: $1,280 |
$848 | 31,067 | $724 | 92 | - | - | - | - | - | - |
$848 31,067 kWh |
$724 92 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $899 Cost: $600 |
- | - | - | - | $899 | 370 | - | - | - | - |
- - kWh |
- - kW-months/year |
$899 370 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,072 Cost: $1,800 |
- | - | - | - | $2,072 | 853 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,072 853 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $150 Cost: $250 |
- | - | - | - | $150 | 62 | - | - | - | - |
- - kWh |
- - kW-months/year |
$150 62 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,546 Cost: $1,220 |
$696 | 25,498 | $850 | 109 | - | - | - | - | - | - |
$696 25,498 kWh |
$850 109 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $440 Cost: - |
$197 | 7,327 | $243 | 31 | - | - | - | - | - | - |
$197 7,327 kWh |
$243 31 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,840 Cost: $37,650 |
$10,387 | 379,543 | $8,389 | 1,072 | $(-2,826) | (-1,171) | $2,280 | - | $1,610 | - | $10,387 379,543 kWh |
$8,389 1,072 kW-months/year |
$(-2,826) (-1,171) MMBtu |
$2,280 - $ |
$1,610 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,780 Cost: $4,550 |
$1,741 | 63,892 | $1,817 | 232 | $2,222 | 915 | - | - | - | - | $1,741 63,892 kWh |
$1,817 232 kW-months/year |
$2,222 915 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption |