Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1996 |
Principal Product | Commercial printing such as publications, books, manuals, et |
NAICS | n/a |
SIC | 2732 - Book Printing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 1,250,000 Pounds |
Production Hrs. Annual | 4,120 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,214 | 691,383 | kWh | $0.10 |
Electricity Demand | $31,549 | 2,574 | kW-months/year | $12.26 |
Electricity Fees | $1,862 | - | $ | - |
Natural Gas | $6,952 | 1,492 | MMBtu | $4.66 |
TOTAL ENERGY COSTS | $107,577 | |||
RECOMMENDED SAVINGS* | $17,834 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,066 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $8,100 Cost: - |
- | - | - | - | - | - | $8,100 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,100 - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,613 Cost: $1,400 |
$1,380 | 33,705 | $1,905 | 148 | $(-672) | (-144) | - | - | - | - |
$1,380 33,705 kWh |
$1,905 148 kW-months/year |
$(-672) (-144) MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $3,082 Cost: $10,500 |
$1,263 | 31,067 | $1,248 | 97 | - | - | - | - | $571 | - |
$1,263 31,067 kWh |
$1,248 97 kW-months/year |
- - MMBtu |
- - gal |
$571 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,686 Cost: - |
$1,686 | 41,325 | - | - | - | - | - | - | - | - |
$1,686 41,325 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $905 Cost: $700 |
- | - | - | - | $905 | 194 | - | - | - | - |
- - kWh |
- - kW-months/year |
$905 194 MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $748 Cost: $1,000 |
$567 | 13,775 | $181 | 14 | - | - | - | - | - | - |
$567 13,775 kWh |
$181 14 kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $369 Cost: $900 |
$369 | 9,086 | - | - | - | - | - | - | - | - |
$369 9,086 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $331 Cost: $640 |
$189 | 4,689 | $142 | 11 | - | - | - | - | - | - |
$189 4,689 kWh |
$142 11 kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,834 Cost: $15,140 |
$5,454 | 133,647 | $3,476 | 270 | $233 | 50 | $8,100 | - | $571 | - | $5,454 133,647 kWh |
$3,476 270 kW-months/year |
$233 50 MMBtu |
$8,100 - gal |
$571 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,066 Cost: $12,840 |
$2,019 | 49,531 | $1,571 | 122 | $905 | 194 | - | - | $571 | - | $2,019 49,531 kWh |
$1,571 122 kW-months/year |
$905 194 MMBtu |
- - gal |
$571 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Water Consumption |