Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1997 |
Principal Product | Cold Drawn Steel Bars |
NAICS | n/a |
SIC | 3316 - Cold Finishing Of Steel Shapes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 191 |
Plant Area (Sq.Ft.) | 330,000 |
Annual Production | 100,000 Tons |
Production Hrs. Annual | 5,500 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $300,589 | 7,883,060 | kWh | $0.04 |
Electricity Demand | $291,090 | 20,739 | kW-months/year | $14.04 |
Electricity Fees | $20,836 | - | $ | - |
Natural Gas | $350,355 | 114,441 | MMBtu | $3.06 |
TOTAL ENERGY COSTS | $1,026,831 | |||
RECOMMENDED SAVINGS* | $344,328 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,327 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $285,742 Cost: $770,000 |
$243,210 | 6,050,117 | $195,096 | 13,200 | $(-144,864) | (-47,341) | - | - | - | - | - | - | $(-7,700) | - | - | - |
$243,210 6,050,117 kWh |
$195,096 13,200 kW-months/year |
$(-144,864) (-47,341) MMBtu |
- - Tgal |
- - lb |
- - lb |
$(-7,700) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $19,558 Cost: $25,000 |
$(-5,283) | (-82,063) | - | - | - | - | $25,341 | 13,772,376 | - | - | - | - | $(-500) | - | - | - |
$(-5,283) (-82,063) kWh |
- - kW-months/year |
- - MMBtu |
$25,341 13,772,376 Tgal |
- - lb |
- - lb |
$(-500) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $17,370 Cost: - |
- | - | - | - | - | - | - | - | $17,370 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$17,370 - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,350 Cost: $5,000 |
- | - | - | - | - | - | - | - | - | - | $1,350 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$1,350 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,522 Cost: $500 |
- | - | - | - | $6,522 | 2,131 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,522 2,131 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $6,051 Cost: $7,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $6,051 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
$6,051 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,805 Cost: - |
$3,220 | 80,012 | $2,585 | 175 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,220 80,012 kWh |
$2,585 175 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,649 Cost: $5,500 |
$1,649 | 41,032 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,649 41,032 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $281 Cost: $600 |
$281 | 7,034 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$281 7,034 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $344,328 Cost: $813,600 |
$243,077 | 6,096,132 | $197,681 | 13,375 | $(-138,342) | (-45,210) | $25,341 | 13,772,376 | $17,370 | - | $1,350 | - | $(-8,200) | - | $6,051 | - | $243,077 6,096,132 kWh |
$197,681 13,375 kW-months/year |
$(-138,342) (-45,210) MMBtu |
$25,341 13,772,376 Tgal |
$17,370 - lb |
$1,350 - lb |
$(-8,200) - $ |
$6,051 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,327 Cost: $500 |
$3,220 | 80,012 | $2,585 | 175 | $6,522 | 2,131 | - | - | - | - | - | - | - | - | - | - | $3,220 80,012 kWh |
$2,585 175 kW-months/year |
$6,522 2,131 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material |