IAC logo
IAC Assessment: WI0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Vacuum-formed ceramic fiber shapes
NAICS n/a
SIC 3297 - Nonclay Refractories
Sales $5,000,000-$10,000,000
# of Employees 48
Plant Area (Sq.Ft.) 37,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,424 1,085,580 kWh $0.03
Electricity Demand $26,774 2,470 kW-months/year $10.84
Electricity Fees $767 - $ -
Natural Gas $112,733 23,619 MMBtu $4.77
TOTAL ENERGY COSTS $243,675
RECOMMENDED SAVINGS* $45,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$24,171
Cost:
$500
- - - - - - - - - - $24,171 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$24,171
-
$
02: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$14,040
Cost:
-
- - - - - - - - $14,040 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$14,040
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,884
Cost:
-
- - - - - - $4,884 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,884
-
lb
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$721
Cost:
-
$444 13,775 $277 24 - - - - - - - - $444
13,775
kWh
$277
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$873
Cost:
$640
$548 16,706 $325 28 - - - - - - - - $548
16,706
kWh
$325
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$331
Cost:
$425
- - - - $331 69 - - - - - - -
-
kWh
-
-
kW-months/year
$331
69
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,020
Cost:
$1,565
$992 30,481 $602 52 $331 69 $4,884 - $14,040 - $24,171 - $992
30,481
kWh
$602
52
kW-months/year
$331
69
MMBtu
$4,884
-
lb
$14,040
-
$
$24,171
-
$
TOTAL IMPLEMENTED Savings:
$26,096
Cost:
$1,565
$992 30,481 $602 52 $331 69 - - - - $24,171 - $992
30,481
kWh
$602
52
kW-months/year
$331
69
MMBtu
-
-
lb
-
-
$
$24,171
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes