IAC logo
IAC Assessment: WI0308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Farm Machinery
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 142,250
Annual Production 2,000 Pieces
Production Hrs. Annual 2,875
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,600 808,324 kWh $0.04
Electricity Demand $19,983 2,290 kW-months/year $8.73
Electricity Fees $755 - $ -
Natural Gas $44,223 8,626 MMBtu $5.13
TOTAL ENERGY COSTS $151,252
RECOMMENDED SAVINGS* $77,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ lb $ $ $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$36,638
Cost:
$2,500
- - - - - - $4,668 11,040 - - - - $31,970 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,668
11,040
lb
-
-
$
-
-
$
$31,970
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$11,074
Cost:
$500
- - - - - - - - - - $11,074 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$11,074
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,031
Cost:
$8,700
- - - - - - $11,031 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,031
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$10,950
Cost:
-
- - - - - - - - - - $10,950 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$10,950
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,700
Cost:
-
- - - - $1,700 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,700
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.8122 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS Savings:
$3,726
Cost:
$1,000
- - - - - - - - $3,375 - - - $351 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$3,375
-
$
-
-
$
$351
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,716
Cost:
-
- - - - - - - - - - $1,716 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$1,716
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$216
Cost:
$90
$129 2,931 $87 10 - - - - - - - - - - $129
2,931
kWh
$87
10
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$77,051
Cost:
$12,790
$129 2,931 $87 10 $1,700 - $15,699 11,040 $3,375 - $23,740 - $32,321 - $129
2,931
kWh
$87
10
kW-months/year
$1,700
-
lb
$15,699
11,040
lb
$3,375
-
$
$23,740
-
$
$32,321
-
$
TOTAL IMPLEMENTED Savings:
$51,530
Cost:
$3,590
$129 2,931 $87 10 - - $4,668 11,040 $3,375 - $10,950 - $32,321 - $129
2,931
kWh
$87
10
kW-months/year
-
-
lb
$4,668
11,040
lb
$3,375
-
$
$10,950
-
$
$32,321
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material