Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1998 |
Principal Product | Powder Metallurgy Components |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 100,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $206,146 | 9,676,143 | kWh | $0.02 |
Electricity Demand | $96,413 | 19,902 | kW-months/year | $4.84 |
Electricity Fees | $(-2,085) | - | $ | - |
Natural Gas | $8,323 | 1,468 | MMBtu | $5.67 |
TOTAL ENERGY COSTS | $411,582 | |||
RECOMMENDED SAVINGS* | $136,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $82,125 Cost: $50,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $82,125 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$82,125 - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $33,613 Cost: $68,000 |
$(-5,199) | (-171,161) | - | - | - | - | $41,624 | 94,601,048 | - | - | - | - | - | - | $(-2,812) | - | - | - | - | - |
$(-5,199) (-171,161) kWh |
- - kW-months/year |
- - MMBtu |
$41,624 94,601,048 Tgal |
- - gal |
- - lb |
- - $ |
$(-2,812) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $7,064 Cost: $1,475 |
- | - | - | - | - | - | $8,564 | 4,757,625 | - | - | - | - | - | - | - | - | - | - | $(-1,500) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,564 4,757,625 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
$(-1,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $4,722 Cost: $14,000 |
- | - | - | - | - | - | - | - | $8,575 | 2,000 | $(-543) | (-820) | $(-2,010) | - | - | - | - | - | $(-1,300) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$8,575 2,000 gal |
$(-543) (-820) lb |
$(-2,010) - $ |
- - $ |
- - $ |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES |
Savings: $1,300 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $1,300 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
$1,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,542 Cost: $1,362 |
$2,869 | 128,077 | $673 | 132 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,869 128,077 kWh |
$673 132 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,180 Cost: - |
- | - | - | - | - | - | - | - | - | - | $2,180 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$2,180 - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,040 Cost: $1,424 |
- | - | - | - | $1,040 | 201 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,040 201 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $931 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $931 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
$931 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $136,517 Cost: $136,261 |
$(-2,330) | (-43,084) | $673 | 132 | $1,040 | 201 | $50,188 | 99,358,673 | $8,575 | 2,000 | $1,637 | (-820) | $80,115 | - | $(-2,812) | - | $931 | - | $(-1,500) | - | $(-2,330) (-43,084) kWh |
$673 132 kW-months/year |
$1,040 201 MMBtu |
$50,188 99,358,673 Tgal |
$8,575 2,000 gal |
$1,637 (-820) lb |
$80,115 - $ |
$(-2,812) - $ |
$931 - $ |
$(-1,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost |