IAC logo
IAC Assessment: WI0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Propane Gas Tanks & Satellite Dish Antennas
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 285,880
Annual Production 9,300,000 Pieces
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,312 10,347,304 kWh $0.02
Electricity Demand $153,810 20,883 kW-months/year $7.37
Electricity Fees $5,700 - $ -
Natural Gas $92,594 55,474 MMBtu $1.67
TOTAL ENERGY COSTS $593,354
RECOMMENDED SAVINGS* $83,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $214
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$69,212
Cost:
$63,760
$(-276) (-11,430) $(-112) (-14) - - - - - - $69,600 - - - $(-276)
(-11,430)
kWh
$(-112)
(-14)
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$69,600
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$6,046
Cost:
$13,200
- - - - - - $8,473 1,530 $(-412) (-627) $(-1,020) - $(-995) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,473
1,530
gal
$(-412)
(-627)
lb
$(-1,020)
-
$
$(-995)
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,599
Cost:
$18,400
$(-1,016) (-42,497) - - $5,615 3,362 - - - - - - - - $(-1,016)
(-42,497)
kWh
-
-
kW-months/year
$5,615
3,362
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,295
Cost:
$940
$1,659 69,461 $636 82 - - - - - - - - - - $1,659
69,461
kWh
$636
82
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,187
Cost:
$500
- - - - $1,187 711 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,187
711
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$214
Cost:
-
- - - - - - - - $214 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$214
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$83,553
Cost:
$96,800
$367 15,534 $524 68 $6,802 4,073 $8,473 1,530 $(-198) (-627) $68,580 - $(-995) - $367
15,534
kWh
$524
68
kW-months/year
$6,802
4,073
MMBtu
$8,473
1,530
gal
$(-198)
(-627)
lb
$68,580
-
$
$(-995)
-
$
TOTAL IMPLEMENTED Savings:
$214
Cost:
-
- - - - - - - - $214 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$214
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material