IAC logo
IAC Assessment: WI0320
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0320
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Medical Rehabilitation Products & Marine Buoys
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 330
Plant Area (Sq.Ft.) 195,000
Annual Production 1,050,000 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,594 5,492,087 kWh $0.02
Electricity Demand $84,415 11,499 kW-months/year $7.34
Electricity Fees $5,700 - $ -
Natural Gas $40,102 8,066 MMBtu $4.97
TOTAL ENERGY COSTS $273,666
RECOMMENDED SAVINGS* $112,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$98,187
Cost:
$100,000
$(-1,310) (-53,634) $(-2,063) (-269) - - $55,200 - $46,360 - $(-1,310)
(-53,634)
kWh
$(-2,063)
(-269)
kW-months/year
-
-
MMBtu
$55,200
-
$
$46,360
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,771
Cost:
$600
- - - - $4,771 960 - - - - -
-
kWh
-
-
kW-months/year
$4,771
960
MMBtu
-
-
$
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,933
Cost:
$6,400
$(-301) (-12,309) - - $4,234 852 - - - - $(-301)
(-12,309)
kWh
-
-
kW-months/year
$4,234
852
MMBtu
-
-
$
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,532
Cost:
-
- - - - $3,532 711 - - - - -
-
kWh
-
-
kW-months/year
$3,532
711
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,433
Cost:
$7,000
$1,433 58,617 - - - - - - - - $1,433
58,617
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$650
Cost:
$740
$400 16,413 $250 33 - - - - - - $400
16,413
kWh
$250
33
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$112,506
Cost:
$114,740
$222 9,087 $(-1,813) (-236) $12,537 2,523 $55,200 - $46,360 - $222
9,087
kWh
$(-1,813)
(-236)
kW-months/year
$12,537
2,523
MMBtu
$55,200
-
$
$46,360
-
$
TOTAL IMPLEMENTED Savings:
$650
Cost:
$740
$400 16,413 $250 33 - - - - - - $400
16,413
kWh
$250
33
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes