IAC logo
IAC Assessment: WI0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Injection Molded Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 37,900
Annual Production 0 Units
Production Hrs. Annual 6,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,894 2,693,435 kWh $0.04
Electricity Demand $84,608 6,870 kW-months/year $12.32
Electricity Fees $3,695 - $ -
Natural Gas $16,411 3,290 MMBtu $4.99
TOTAL ENERGY COSTS $206,247
RECOMMENDED SAVINGS* $29,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,357
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$18,977
Cost:
-
- - - - - - - - $18,977 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$18,977
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$3,491
Cost:
$1,250
- - - - - - $3,491 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,491
-
$
-
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$3,047
Cost:
$500
- - - - - - - - $3,047 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,047
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,883
Cost:
$285
$1,276 33,998 $607 47 - - - - - - $1,276
33,998
kWh
$607
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$950
Cost:
$712
- - - - $950 190 - - - - -
-
kWh
-
-
kW-months/year
$950
190
MMBtu
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$287
Cost:
$820
- - - - $287 58 - - - - -
-
kWh
-
-
kW-months/year
$287
58
MMBtu
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$726
Cost:
$200
- - - - $726 146 - - - - -
-
kWh
-
-
kW-months/year
$726
146
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$380
Cost:
$840
$237 6,448 $143 11 - - - - - - $237
6,448
kWh
$143
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,741
Cost:
$4,607
$1,513 40,446 $750 58 $1,963 394 $3,491 - $22,024 - $1,513
40,446
kWh
$750
58
kW-months/year
$1,963
394
MMBtu
$3,491
-
$
$22,024
-
$
TOTAL IMPLEMENTED Savings:
$19,357
Cost:
$840
$237 6,448 $143 11 - - - - $18,977 - $237
6,448
kWh
$143
11
kW-months/year
-
-
MMBtu
-
-
$
$18,977
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes