IAC logo
IAC Assessment: WI0334
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0334
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Inner and Box Spring Components
NAICS n/a
SIC 3495 - Wire Springs
Sales $5,000,000-$10,000,000
# of Employees 140
Plant Area (Sq.Ft.) 130,000
Annual Production 900,000 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,179 1,928,781 kWh $0.02
Electricity Demand $38,439 4,741 kW-months/year $8.11
Electricity Fees $6,650 - $ -
Natural Gas $35,671 8,444 MMBtu $4.22
TOTAL ENERGY COSTS $123,252
RECOMMENDED SAVINGS* $192,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,704
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$182,000
Cost:
$200,000
- - - - - - $182,000 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$182,000
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$3,225
Cost:
$500
- - $3,225 - - - - - - - -
-
kWh
$3,225
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$2,932
Cost:
$6,000
- - $2,932 695 - - - - - - -
-
kWh
$2,932
695
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,172
Cost:
$6,200
$(-380) (-15,826) $2,552 605 - - - - - - $(-380)
(-15,826)
kWh
$2,552
605
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,094
Cost:
$800
- - $1,094 259 - - - - - - -
-
kWh
$1,094
259
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$400
Cost:
$1,875
$(-78) (-3,224) - - $478 569,424 - - - - $(-78)
(-3,224)
kWh
-
-
MMBtu
$478
569,424
Tgal
-
-
$
-
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$385
Cost:
$200
- - - - - - - - $385 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$385
-
$
TOTAL RECOMMENDED Savings:
$192,208
Cost:
$215,575
$(-458) (-19,050) $9,803 1,559 $478 569,424 $182,000 - $385 - $(-458)
(-19,050)
kWh
$9,803
1,559
MMBtu
$478
569,424
Tgal
$182,000
-
$
$385
-
$
TOTAL IMPLEMENTED Savings:
$4,704
Cost:
$1,500
- - $4,319 259 - - - - $385 - -
-
kWh
$4,319
259
MMBtu
-
-
Tgal
-
-
$
$385
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes