Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1998 |
Principal Product | Inner and Box Spring Components |
NAICS | n/a |
SIC | 3495 - Wire Springs |
Sales | $5,000,000-$10,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 900,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $44,179 | 1,928,781 | kWh | $0.02 |
Electricity Demand | $38,439 | 4,741 | kW-months/year | $8.11 |
Electricity Fees | $6,650 | - | $ | - |
Natural Gas | $35,671 | 8,444 | MMBtu | $4.22 |
TOTAL ENERGY COSTS | $123,252 | |||
RECOMMENDED SAVINGS* | $192,208 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,704 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $182,000 Cost: $200,000 |
- | - | - | - | - | - | $182,000 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$182,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $3,225 Cost: $500 |
- | - | $3,225 | - | - | - | - | - | - | - |
- - kWh |
$3,225 - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $2,932 Cost: $6,000 |
- | - | $2,932 | 695 | - | - | - | - | - | - |
- - kWh |
$2,932 695 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,172 Cost: $6,200 |
$(-380) | (-15,826) | $2,552 | 605 | - | - | - | - | - | - |
$(-380) (-15,826) kWh |
$2,552 605 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,094 Cost: $800 |
- | - | $1,094 | 259 | - | - | - | - | - | - |
- - kWh |
$1,094 259 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $400 Cost: $1,875 |
$(-78) | (-3,224) | - | - | $478 | 569,424 | - | - | - | - |
$(-78) (-3,224) kWh |
- - MMBtu |
$478 569,424 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8112 COMBINE UTILITY METERS |
Savings: $385 Cost: $200 |
- | - | - | - | - | - | - | - | $385 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - $ |
$385 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $192,208 Cost: $215,575 |
$(-458) | (-19,050) | $9,803 | 1,559 | $478 | 569,424 | $182,000 | - | $385 | - | $(-458) (-19,050) kWh |
$9,803 1,559 MMBtu |
$478 569,424 Tgal |
$182,000 - $ |
$385 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,704 Cost: $1,500 |
- | - | $4,319 | 259 | - | - | - | - | $385 | - | - - kWh |
$4,319 259 MMBtu |
- - Tgal |
- - $ |
$385 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes |