IAC logo
IAC Assessment: WI0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Grinded and Machined Parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 78,463
Annual Production 1,920,000 Pieces
Production Hrs. Annual 5,355
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,762 2,276,964 kWh $0.04
Electricity Demand $103,974 8,588 kW-months/year $12.11
Electricity Fees $29,964 - $ -
Natural Gas $45,590 16,218 MMBtu $2.81
TOTAL ENERGY COSTS $266,742
RECOMMENDED SAVINGS* $14,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,476
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,546
Cost:
$13,122
$1,786 38,687 $2,760 216 - - - - - - $1,786
38,687
kWh
$2,760
216
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,263
Cost:
$500
- - - - - - - - $4,263 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,263
-
$
03: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$1,981
Cost:
-
- - - - - - $1,981 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,981
-
$
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$1,508
Cost:
$1,000
$318 6,741 - - $1,190 424 - - - - $318
6,741
kWh
-
-
kW-months/year
$1,190
424
MMBtu
-
-
$
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,212
Cost:
$1,538
- - - - $1,212 431 - - - - -
-
kWh
-
-
kW-months/year
$1,212
431
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$474
Cost:
$500
- - - - $474 169 - - - - -
-
kWh
-
-
kW-months/year
$474
169
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$456
Cost:
$740
$198 4,396 $258 20 - - - - - - $198
4,396
kWh
$258
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,440
Cost:
$17,400
$2,302 49,824 $3,018 236 $2,876 1,024 $1,981 - $4,263 - $2,302
49,824
kWh
$3,018
236
kW-months/year
$2,876
1,024
MMBtu
$1,981
-
$
$4,263
-
$
TOTAL IMPLEMENTED Savings:
$5,476
Cost:
$14,362
$1,984 43,083 $3,018 236 $474 169 - - - - $1,984
43,083
kWh
$3,018
236
kW-months/year
$474
169
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost