Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2000 |
Principal Product | Toy Vehicles |
NAICS | n/a |
SIC | 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 420,000 |
Annual Production | 1,250,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,114 | 1,379,250 | kWh | $0.04 |
Electricity Demand | $62,762 | 5,343 | kW-months/year | $11.75 |
Electricity Fees | $7,509 | - | $ | - |
Natural Gas | $82,608 | 22,985 | MMBtu | $3.59 |
TOTAL ENERGY COSTS | $245,312 | |||
RECOMMENDED SAVINGS* | $83,378 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $44,625 Cost: $68,300 |
- | - | - | - | - | - | - | - | - | - | - | - | $44,625 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$44,625 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $22,313 Cost: $2,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $22,313 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$22,313 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $6,415 Cost: $25,000 |
$(-313) | (-8,499) | $(-509) | (-42) | - | - | $7,237 | 7,390,103 | - | - | - | - | - | - | - | - |
$(-313) (-8,499) kWh |
$(-509) (-42) kW-months/year |
- - MMBtu |
$7,237 7,390,103 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $3,068 Cost: $6,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $3,068 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
$3,068 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $576 Cost: - |
$254 | 6,741 | $322 | 27 | - | - | - | - | - | - | - | - | - | - | - | - |
$254 6,741 kWh |
$322 27 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,960 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,960 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$1,960 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $1,671 Cost: - |
- | - | - | - | - | - | - | - | $1,872 | 158 | $(-33) | (-70) | $(-37) | - | $(-131) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$1,872 158 gal |
$(-33) (-70) lb |
$(-37) - $ |
$(-131) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES |
Savings: $1,159 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $788 | - | $371 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$788 - $ |
$371 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $845 Cost: $1,000 |
- | - | - | - | $845 | 235 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$845 235 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $532 Cost: - |
$203 | 5,275 | $329 | 27 | - | - | - | - | - | - | - | - | - | - | - | - |
$203 5,275 kWh |
$329 27 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $214 Cost: $1,020 |
- | - | $(-7) | (-1) | $221 | 62 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$(-7) (-1) kW-months/year |
$221 62 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $83,378 Cost: $104,320 |
$144 | 3,517 | $135 | 11 | $1,066 | 297 | $7,237 | 7,390,103 | $1,872 | 158 | $1,927 | (-70) | $67,689 | - | $3,308 | - | $144 3,517 kWh |
$135 11 kW-months/year |
$1,066 297 MMBtu |
$7,237 7,390,103 Tgal |
$1,872 158 gal |
$1,927 (-70) lb |
$67,689 - $ |
$3,308 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |