IAC logo
IAC Assessment: WI0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 128,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 6,480
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $298,877 8,180,246 kWh $0.04
Electricity Demand $256,251 18,267 kW-months/year $14.03
Electricity Fees $17,275 - $ -
Natural Gas $91,931 26,064 MMBtu $3.53
TOTAL ENERGY COSTS $816,018
RECOMMENDED SAVINGS* $198,948 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$141,912
Cost:
$70,000
- - - - - - $141,912 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$141,912
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,107
Cost:
$20,000
$35,269 918,523 $19,779 1,343 $(-36,941) (-10,465) - - $35,269
918,523
kWh
$19,779
1,343
kW-months/year
$(-36,941)
(-10,465)
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,119
Cost:
$6,500
- - - - $17,119 4,850 - - -
-
kWh
-
-
kW-months/year
$17,119
4,850
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,935
Cost:
$3,250
$8,709 226,846 $4,640 315 $(-3,414) (-967) - - $8,709
226,846
kWh
$4,640
315
kW-months/year
$(-3,414)
(-967)
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,952
Cost:
$1,000
- - - - $5,952 1,686 - - -
-
kWh
-
-
kW-months/year
$5,952
1,686
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,745
Cost:
$640
$1,824 47,479 $921 63 - - - - $1,824
47,479
kWh
$921
63
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,623
Cost:
$1,033
- - - - $1,623 460 - - -
-
kWh
-
-
kW-months/year
$1,623
460
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,185
Cost:
$427
$774 20,223 $411 28 - - - - $774
20,223
kWh
$411
28
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$370
Cost:
$375
- - - - $370 105 - - -
-
kWh
-
-
kW-months/year
$370
105
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$198,948
Cost:
$103,225
$46,576 1,213,071 $25,751 1,749 $(-15,291) (-4,331) $141,912 - $46,576
1,213,071
kWh
$25,751
1,749
kW-months/year
$(-15,291)
(-4,331)
MMBtu
$141,912
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes